| 03/10/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/10/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Modify second GCO from building to comply with Section 719.4, UPC. 2. Provide the total number of fixture units to be handled by the new 6" building sewer. Reference 703.1, UPC 1994. 3. Correct size of fire department connection. Reference Section 4-15.2.2, NFPA 13. 4. Indicate the inverts of the new building sewer at its points of connection to the existing building sewer as well as its minimum slope. Reference Sections 718.1 and 718.3, UPC 1994. 5. Verify size of RPBP after meter (detail 6/m2) complies to Section 610.2, UPC 1994. 6. Provide detail of water heater installation, including excess pressure relief, expansion tank, and valves. Reference Section 302.3, Uniform Administrative Code 1994. 7. Confirm that suspended water heater complies with access requirements of Section 511.0, UPC 1994. 8. Coordinate stack and riser diagram with floor plan. 9. Provide cleanouts at P-1, P-2, P-3, and S-1 fixtures. Reference Section 707.4, UPC 1994. 10. Coordinate natural gas piping and calculations with mechanical plans. 11. Coordinate natural gas calculations with heating capacity of rooftop units on mechanical plans. 12. Provide water shut off valves as required in Section 605.1, UPC 1994. |
| 03/10/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide minimum outside air quantity to multipurpose room per Table 403.3, IMC 2000 whenever the area is occupied. Additional outside air may be supplied as required to maintain the CO2 concentration as noted in the Sequence of Operation. 2. Coordinate mechanical components listed in Summary Compliance Report with equipment specified on drawings. |
| 03/11/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 03/18/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1.A deferred submittal requires approval of the Building Official. Submit in writing a request for deferral of the metal building plans to the Building Official. 2. Provide location of the assumed property line between buildings or include allowable area calculations for adjacent structures. References section 704.3 IBC. 3. If assumed property line is to be used provide details for required fire protection. Reference Table 602 IBC 4. Provide existing and new buildings plumbing fixture count showing compliance with the total fixtures required per Table 2902.1 IBC. 5. Room 100 and 103 requires an one-hour fire barrier for separation from main use. References section 302.1 IBC. Revise plans 6. Note. A set of approved plans will be required for each site |
| 03/20/2003 | GERRY KOZIOL | WWM | REVIEW | Denied | Needs manhole tap permit. |
| 03/26/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Panel MP1-37. Feeds a GFI on the Power Plan, but is listed as a spare on the Panel Schedule. 2. Provide rooftop receptacles for AC-1 through AC-6. On Sheet 3M1 these units appear to have convenience outlets, but per NEC 210-63 these outlets shall not be connected to the load side of the equipment disconnecting means. 3. Check CB rating on AC units to verify if sized per manufacturer recommendations. |
| 12/03/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | |
| 12/03/2002 | DAVID RIVERA | ZONING | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/27/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |