| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/22/2003 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | TO: The IEF Group, Inc. 705 N. Seventh Ave Tucson, AZ 85705 FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner Development Services Dept. PROJECT: T02CM02009 The IEF Group, Inc. Architects/Planners 700 N. Stone Ave. Site Plan Review (2nd review) TRANSMITTAL: January 22, 2003 Upon completion of the following revision/addition, an over the counter review may be arranged to obtain stamped approval by the zoning review section without resubmitting the site plan. The following item must be revised on or added to the site plan: 1. If sheet G 1.0 is going to remain as the "Title Sheet", revise legal description to be correct, revise on and off-site parking layout, remove all notes/references to nonconforming status, and make all other applicable changes per first review comments. Otherwise, remove sheet G 1.0 and place legend, sheet index , etc. on variance site plan sheet G 1.1. DS 2-02 2. Add the Board of Adjustment variance case number, date of approval, what the variances were approved for and any conditions of approval on the site plan. DS 2-02.2.1.A.38 3. Revise setback note on drawing and in the calculation notes to specify that the required MS&R street perimeter yard setback is 22 feet, which is the height of exterior building wall, measured from back of future curb location. LUC 3.2.6.5 4. The near side sight visibility triangles, at the intersection of Stone Ave and 4th St. (dimensioned at 340'), and at the intersection of Echols Ave and 4th St. (dimensioned at 110'), are drawn incorrectly and may be removed since they do not impact the project site. DS 2-02.2.1.A.10 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
| 01/22/2003 | PETER MCLAUGHLIN | HANDICAP-SITE | REVIEW | Approved | |
| 01/24/2003 | BLANCA ESPINO | ENGINEERING | REVIEW | Denied | Site Plan 1. Indicate lot bearings along with dimensions of site. D.S. 2-02.2.1.5 2. Indicate a downspout and roof drain detail. Indicate roof drainage discharge on north side of building how it impacts adjacent property. D.S. 2-02.2.1.6 3. Indicate if existing sidewalk scupper meets development standard details D204 or D205. 4. Label existing and future sight visibility triangles. D.S. 2-02.2.1.10 5. Indicate refuse container location, size and access thereto fully dimensioned. Screening and gates are required for refuse enclosure. If existing conditions are to remain, a signature from Rene Duarte of Solid Waste is required. D.S. 2-02.2.1.32 Indicate a refuse enclosure detail. D.S. 6-01.4.2.A-D |
| 01/28/2003 | BLANCA ESPINO | FLOODPLAIN | REVIEW | Denied | SEE ENGINEERING COMMENTS. |
| 01/28/2003 | BLANCA ESPINO | SANITATION | REVIEW | Denied | SEE ENGINEERING COMMENTS. |
| 01/31/2003 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/03/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |