Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T01CM04824
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/27/2001 | PETER MCLAUGHLIN | ZONING | REVIEW | Passed | |
10/01/2001 | JIM EGAN | FIRE | REVIEW | Approved | |
10/01/2001 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Passed | |
10/01/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
10/01/2001 | BLANCA ESPINO | FLOODPLAIN | REVIEW | Approved | |
10/17/2001 | TOM CLARK | WATER | REVIEW | Approved | |
10/17/2001 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | SEE COMMENTS ATTACHED TO APPLICATION. |
10/23/2001 | CAGUILAR | WWM | REVIEW | Passed | |
10/23/2001 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.DP 2,4,6 contradicted on panel schedule, its used as 75 kva transformer feed but on sheet 16 DP 2,4,6 are used for a heat pump feeder. 2.Circuits B 1,3,5,7,9,11 should be using 3 pole breakers not single pole. 3.Circuits A 1,3,5,7,9,11 appear to be under calculated.Please provide the ballast load so I can verify these loads are correct.(please double check your calculations). 4.Provide fixture cut sheets on all outdoor fixtures. 5.Install grounding electrode system at new building and bond metalic piping systemsas required. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/26/2001 | JKOZUCH | OUT TO CUSTOMER | Completed |