Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T01CM02242
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2001 | DAN CASTRO | ZONING | REVIEW | Approved | |
05/11/2001 | JIM EGAN | FIRE | REVIEW | Approved | |
05/15/2001 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved | |
05/16/2001 | GERRY KOZIOL | WWM | REVIEW | Approved | |
05/17/2001 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | |
05/18/2001 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Provide the manufactures name, listing and capacity of the grease interceptor. Provide the amount of fixture units on the system. Grease interceptors shall comply with Appendix H UPC 1994 Az. Code. 2. Provide data to show why the 3-comp sink complies with Sec 801.2 UPC 1994 Az. Code. 3. Gas water heater shall comply with Table 5-1 UPC 1994 Az.Code. T&P shall discharge in an approved location. ( not the drain pan) 4. Provide a union after the M.O.S.O.V. and before the A.G.S.O.V. - show on the plan. |
05/18/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Architect shall provide a complete detail of construction, support of the 1 hour chase required for the type-I hood on the plan. If a fire rated wrap is used, provide the manufactures name on the plan. 2. Show on the plan how the mechanical design complies with Chapter 4 IMC 2000. 3. Comply with Sec 506.3.13.3 and Sec 606 IMC 2000, show on the plan. 4. Provide a condensate line, size and discharge location on the plan. |
05/21/2001 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | E2.1 1) Several circuits indicate a panel "A" designation. They should circuit to the "L" panel. 2) Provide a fixture schedule that includes the fixture loads in VA. 3) Connect the EP emergency light in the front of the store to circuit L-25. See 99NEC 700-12(e). E3.1 1) Several circuit breaker sizes are missing from panel "L". 2) The walk-in cooler loads in the equipment schedule and the panel do not match. See circuit L-35,37,39. If the load in the panel is correct the #10 wire specified is too small. 3) Provide disconnects for all appliances, including the walk-ins per 99NEC 422 part C. 4) The walk-in freezer load in the equipment schedule does not match the load in the panel schedule. See circuit L-30,32,34. 5) There are 3 homerun leaders in the front of the store which do not appear to terminate anywhere. 6) Circuits L-19,29,10 and 12 appear in the panel however I cannot locate them on the plan. 7) Provide a WP GFCI receptacle on the rooftop within 25' of the HVAC equipment. 99NEC 210-63. 8) The bonding jumper from the 75 kVA transformer to panel "L" must be increased to a #4 copper minimum. See 99NEC 250-30 9) Provide a fault current analysis to panel "H". Please note fuse let- through values are not acceptable unless part of a UL listed integrated short circuit series rated system. The following MALL requirements must be included on full size sheets and integrated into each submission set. 1) Mall service location, service designation, service capacity, total service load (both new and existing), total number of service disconnects, and a complete one-line service diagram. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/21/2001 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |