Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S20-057
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/26/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
08/26/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | Letter: February 12, 2021 To: Rick Engineering Company, Inc. 3945 E. Fort Lowell Rd #111 Tucson, AZ 85712 Attn: Chuck Martin SUBJECT: Water Availability for Project: 1625 N. Campbell Ave., APN: 12310001H, Case#: WA3422, T-14 R-14 S-06, Lots: 9999, Location Code: UNI: Total Area: 29.91ac, Zoning: PAD-28 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Sincerely, Michael Mourreale, Engineering Manager Tucson Water New Development |
08/26/2021 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To: Applicant From: Planning & Development Svcs. Dept. Please contact Pima County Wastewater (email: Sewer@Pima.gov, phone 520-724-6500) and request approval. Include the Pima Co WW approval document in your next submittal. This will be required before the last step of Mayor and Council's final approval. |
08/27/2021 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Letter (on file, see Documents section): TO: CDRC Office, Subdivision Review, City of Tucson FROM: Ada Janson, GIS Cartographer, Pima County Assessor's Office DATE: August 27, 2021 RE: Assessor's Review and Comments Regarding: S20-057 2ND SUBMITTAL FINAL PLAT BANNER UNIVERSITY MEDICAL CENTER TUCSON BLOCK 1 X Plat meets Assessor's Office requirements. |
09/15/2021 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | Email from: <Addressing@pima.gov> To: CDRC Cc: Chuck Martin Wed 9/15/2021 8:15 AM BANNER , 2nd submittal, S20-057, is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
10/08/2021 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | Email from: TEPDEVREV@tep.com To: CDRC Fri 10/8/2021 11:02 AM Tucson Electric Power Co. (TEP) has reviewed and has no objection to the Tentative plat for Banner. Costs for the removal or relocation of existing TEP facilities will be billable to the developer. A Preliminary electrical design is in process. A Construction drawing will be prepared after customer approval of the Preliminary plan and receipt of the Approved Tentative Plat. Please ensure all electrical easements are noted before the final plat. Tucson Electric Power Co. Land Resources Department Attn: Courtney Tejeda |
10/25/2021 | SBEASLE1 | ENGINEERING | REVIEW | Approved | The signature line for "Assurances" on page one of the Final Block Plat has been corrected to read: City of Tucson Engineer. Sharon Beasley, Permit Specialist City of Tucson |
11/02/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change |