Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S14-009
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S14-009
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/12/2014 AROMERO4 START PLANS SUBMITTED Completed
03/20/2014 PGEHLEN1 UTILITIES SOUTHWEST GAS Approved See comments in SIRE
03/24/2014 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change SUBJECT: SIERRA MORADO UNIT 3 PHASE II

S14-009



Tucson Electric Power Co. (TEP) has reviewed the Final Plat for Sierra Morado Unit 3 Phase II submitted on March 13, 2014. TEP is unable to approve the plat at this time. Prior to approving the Final Plat, an electrical design must be completed, and all required easements for electrical facilities must be shown on the Final Plat.



In order for TEP to prepare the electrical design, please submit a pdf copy of the Approved Tentative Plat to mburke@tep.com, along with the subdivision AutoCAD file. Please include water plans.



If you have any questions, or need additional information, please contact me at 917-8744.



Thank you,



Mary Burke

Right of Way Agent

Tucson Electric Power Co.

Mail Stop HQW603

PO Box 711, Tucson, AZ 85702

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
03/27/2014 PGEHLEN1 PIMA COUNTY WASTEWATER Approved REGIONAL WASTEWATER RECLAMATION DEPARTMENT
201 NORTH STONE AVENUE
TUCSON, ARIZONA 85701-1207
JACKSON JENKINS PH: (520) 724-6500
DIRECTOR FAX: (520) 724-9365

March 27, 2014


To: Greg Carlson, P.E., Project Manager
Greg Carlson Engineering, LLC

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Francisco Galindo, P.E., Civil Engineer
Planning and Engineering - DLU

Subject: Sierra Morado Unit 3, Phase 2
Final Plat - 1st Submittal, S14-009, Review Comments

The drawings of the Final Plat for the proposed project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department.
PCRWRD hereby approves the above referenced submittal of the Final Plat received by us on March 12, 2014.
Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) will need to be obtained.

If you have any questions regarding the above comments, please contact me.




Francisco Galindo, P.E.
Planning and Engineering - Development Liaison Unit


Cc: Chad Amateau, P.E., RWRD
Lorenzo Hernandez, P.E., RWRD
Project file: S14-009; T15S, R15E, Section 12
04/02/2014 MICHAEL ST. PAUL ZONING REVIEW Reqs Change CDRC TRANSMITTAL


FROM: Michael St Paul Planning Technician

PROJECT:
S14-009
10990 East Drexel Road
Final Plat for Sierra Morado Unit 3, Phrase 2


TRANSMITTAL: April 2, 2014


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Unified Development Code (Section 8.4.1) and the Administrative Manual (Section 2-07) were addressed.


"A final plat shall be approved and recorded within three years of the tentative plat approval date. A final plat is subject only to the ordinances in effect at the time of the tentative plat application except where an ordinance specifically states that it applies to pending applications" (UDC Section 8.5.2.A Final Plat Approval Period).

Place the subdivision number (S14-009) in the lower right corner of each sheet near the title block (AM 2-07.5.1.H).

The dedication language if the first paragraph (AM 2-07.5.3.B.2.a) is missing the last word "drainageways." Correct the paragraph.

The tentative and final plats match. Provide the reference numbers (DP13-0239, S14-008 & S14-009) on the tentative and final plats.
04/02/2014 LAITH ALSHAMI ENGINEERING REVIEW Reqs Change Laith Alshami, Engineering and Floodplain Review, 04/02/2014,

SUBJECT: Sierra Morado Unit 3, Phase 2
S14-009, Ref. S06-056, T15S, R15E, SECTION 12

RECEIVED: Final Plat, Assurances and CC & R's on March 12, 2014

The subject project has been reviewed. We offer the following comments. Prepare a detailed response that explains the revisions that were made and references the exact location on the Final Plat and Assurances where the revisions were made:

Final Plat:

1. The Development Package (DP13-0239) has not been approved yet.
2. Provide the complete new S14- _______ number (A.M. 2-07.5.1.H).
3. All lots that are adjacent to common areas should have 1' no vehicular access easements along the sides that abut the common area (A.M. 2-07.5.4.H).
4. Is the State Lease #3457 proposed to be abandonment? If yes, the abandonment has to be processed before the Final Plat can be approved.
5. The distance and bearings between all monuments used shall be labeled whether they are measured or calculated (A.M. 2-07.5.5.C.5).
6. It appears that the lot lines and lot areas for some lots have changed from the submitted Tentative Plat. Clarify the reason and revise if necessary (A.M. 2-07.5.5.).
7. Which easements, listed in the Title Report, are located in Phase 2?
8. In order to expedite the plat review and approval, provide the boundary survey and closure calculations report in accordance with D.S. 2-03.6.5.C.3.
9. Submit a copy of the Assurances package.

CC & R's

The CC & R's are acceptable for Engineering and Floodplain purposes.

Assurances:

1. Complete the S14_____ number wherever applicable within the Assurances documents.
2. Replace the reference to Development Standard No. 1-04. with Administrative Manual Section 2-09.0.0.
3. Include the "Trust Agreement" in the Assurances Package.
4. Include the "Special Warranty Deed" in the Assurances Package.


RESUBMITTAL REQUIRED: Revised Final Plat, Title Report and Assurances
04/04/2014 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Reqs Change 201 N. STONE AV, 1ST FL

TUCSON, AZ 85701-1207





MICHELENE NOWAK
ADDRESSING REVIEW

PH #: 724-9512



TO:
CITY PLANNING
FROM:
MICHELENE NOWAK, ADDRESSING REVIEW

SUBJECT:
S14-009 SIERRA MORADO UNIT 3 PHASE II/FINAL PLAT-1ST REVIEW

DATE:
APRIL 4, 2014








The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:



1. Label project# S14-009 on all sheets.



2. Correct Title Block on all sheets to show: Sierra Morado Unit 3, Phase 2 is a Resubdivision of Sierra Morado Unit 3, Lots 807 through Lot 871 and Common Areas “A” . . . . per Book 62, Page 82
04/08/2014 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)



FROM: Susan King
GIS Cartographer
Pima County Assessor's Office


DATE: March 14, 2014


RE: Assessor's Review and Comments Regarding Final Plat
S14-009 Sierra Morado Unit 3 Phase 2

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS: Please add Sierra Morado Unit 4 SQ20113530084 to the north on the plat, UNSUBDIVIDED on the east side (with an indication that Unit 3 Phase 1 will be in that place); Add Sierra Morado Unit 3 M&P 62/082 on the south and west side. Thank you for your submittal.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
04/09/2014 PGEHLEN1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Passed
04/09/2014 PGEHLEN1 UTILITIES CENTURYLINK Passed
04/09/2014 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved See letter in SIRE
04/09/2014 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Four rolled sets of the plans
2) a disk containing all items submitted
3) all items requested by review staff
4) All items needed to approve this plan

Final Status

Task End Date Reviewer's Name Type of Review Description
04/09/2014 CPIERCE1 REJECT SHELF Completed