Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TENTATIVE PLAT REVIEW
Plan Number - S04-106
Review Name: RESUBMITTAL - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/02/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
11/04/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
11/04/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | TO: Patricia Gehlen; CDRC Coordinator DATE: November 4, 2004 SUBJECT: Engineering review of the Flowers Condominiums Tentative Plat. The activity number is S04-106. SUMMARY: The Tentative Plat and Geotechnical Report were received by Engineering on November 2nd, 2004. ENGINEERING HAS REVIEWED THE RECEIVED ITEMS AND RECOMMENDS APPROVAL OF THE TENTATIVE PLAT, DRAINAGE REPORT AND THE GEOTECHNICAL REPORT. GENERAL COMMENTS 1. The Drainage Report was reviewed for Tentative Plat purposes only. 2. Please include the Assurance Package with the Final Plat submittal. This package must include the original Third Party Trust, the original Amendment to Trust, a copy of the Trust Agreement, a copy of the Deed, and a Title Report. 3. Include a copy of the CC&Rs with the Final Plat submittal. The specific maintenance notes specified in the Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 14.3.2 must be included on the Final Plat or in the CC&Rs. The term "owner" in the maintenance notes is to be replaced with "Homeowners Association". 4. Please provide a copy of the boundary closure calculations with the Final Plat submittal. 5. A Grading Plan and Permit will be required. Proposed grading in excess of 5,000 yards is designated "engineered grading" and a soils engineering report is required with the Grading Plan submittal. IBC Chapter 36, Section 9. The Soils Report must also address the requirements detailed in the Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 14.2.6. 6. Proposed fills in excess of two feet above existing grade at any location in the outer one hundred feet of the developing site adjacent to residentially zoned property require the procedure outlined in IBC Chapter 36 Section13.1. This process must be complete prior to Grading Plan approval. 7. Proposed developments disturbing areas exceeding 1 acre are subject to NPDES requirements. 8. All proposed easements must be shown in a surveyable manner on the Final Plat. 9. Flood Use Permit is required prior to grading plan approval. |
11/08/2004 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed |