Plan: S04-106
Plan Details
Apply Date:
08/12/2004
Applicant:
TSANG, ANTONY C
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2005 | ASSURANCE - PC WASTEWATER | DEQ | Approved | |
| 06/12/2006 | ASSURANCE - DSD | DROBERTS | Approved | THIS SITE WAS CHECKED AND APPROVED FOR THE INITIAL RELEASE OF UNITS, THE FOLLOWING ITEMS HAVE BEEN FOUND NOT TO BE COMPLETE AT THIS TIME. 1) PROVIDE DOCUMENTATION FROM THE SIGNING ENGINEER ON FOR THIS SITE(ANTHONY TSANG) STATING THAT IT HAS BEEN CONSTRUCTED PER THE APPROVED PLANS. THE WEIR OUTLET STRUCTRES ARE ABOVE THE TOP OF THE BERMS SURROUNDING THE BASINS. IT APPEARS THAT THE BASINS ARE NOT CONSTRUCTED PER THE APPROVED PLANS AND MAY NOT BE RETAINING THE REQUIRED AMOUNT OF WATER AS NOTED IN THE DRAINAGE REPORT FOR THIS SITE. 2) THE PARKING AREA HAS TWO AREAS WHERE ASPHALT HAS BEEN REMOVED FOR THE INSTALLATION OF ELECTRICAL CONDUITS FOR FUTURE LIGHTING. REPAIR THE ASPHALTIC CONCRETE PAVEMENT IN THESE AREAS PRIOR TO ASKING FOR THE FINAL RELEASE. 3) PROVIDE A LETTER OF CERTIFICATION FOR THE DRAINAGE WAYS, BASINS, AND INLET STRUCTURES FROM THE SIGNING ENGINEER FOR THIS PROJECT. THIS SHOULD INCLUDE SPECIFIC ELEVATION INFORMATION OF ALL BASINS NOTING THE BOTTOM, TOP OF BERM, AND WIER OULET ELEVATIONS IN ALL AREAS. 4) COMPLETE THE FINAL GRADING INSPECTION PRIOR TO YOU REQUESTING THE FINAL RELEASE OF THE ASSURANCES. |
| 04/18/2007 | ASSURANCE - UTILITY SERVICES | DEQ | Approved |
Plan Reviews
Plan Number - S04-106
Plan Status: Final
Plan Description: SUBC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2005 | FINAL PLAT REVIEW | 02/23/2005 | COMPLETED |
| 04/22/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 05/23/2005 | COMPLETED |
| 04/25/2005 | ASSURANCES | 05/05/2005 | COMPLETED |
| 06/23/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 07/21/2005 | COMPLETED |
| 06/23/2005 | ASSURANCES | 06/24/2005 | COMPLETED |
| 08/02/2005 | FINAL PLAT PACKAGE | 09/20/2005 | COMPLETED |
| 08/12/2004 | TENTATIVE PLAT REVIEW | 09/15/2004 | COMPLETED |
| 08/26/2005 | ASSURANCES | 08/31/2005 | COMPLETED |
| 09/29/2004 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 10/21/2004 | COMPLETED |
| 11/02/2004 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 11/08/2004 | COMPLETED |