Permit Review Detail
Review Status: Completed
Review Details: DEV STDS MODIFICATION REVIEW
Permit Number - DS16-04
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/29/2016 | KROBLES1 | START | PLANS SUBMITTED | Approved | |
| 02/01/2016 | DAVID RIVERA | H/C SITE | REVIEW | Approv-Cond | See Zoning comments. |
| 02/01/2016 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL FROM: David Rivera Principal Planner DSD Zoning Review Section PROJECT: DS16-04 2543 E. Grant Road TSMR request for the Proposed development "The Yard" Development Standard Modification Request Transmittal date: February 1, 2016 COMMENTS: Approved with conditions 1. TSMR request number 1, conditionally approved pending approval by Environmental Services. 2. TSMR request number 2, conditionally approved. Must provide running and cross slope analysis on the DP that demonstrates compliance for ADA accessibility. The analysis must be provided for the Grant Road site frontage and along the Tucson Boulevard sidewalk area to Spring Street. 3. TSMR request 3, conditionally approved pending approval by TDOT. The appropriate accessible ramps must be provided on both sides of the driveway entrance. 4. List the DS case number in the lower right corner of the DP plan sheets and add as a general note the case number date of approval and conditions of approval. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
| 02/04/2016 | PATRICIA GEHLEN | ZONING-DECISION LETTER | WRITE DECISION LETTER | Approv-Cond | This TSMR was conditionally approved on 2/4/2016. See conditions of approval from Zoning, ADA and TDOT |
| 02/04/2016 | JOSE ORTIZ | TRAFFIC | TRAFFIC | Approv-Cond | TSMR 16-04 From TDOT Zelin Canchola Feb 4 2016 TDOT will support the TSMR to provide an apron on north side with curb return on south (inbound side) for the modified driveway along country Club for the YARD development. A detail showing how the proposed driveway will work with the surrounding infrastructure prior to the next DP submital will be required. |
| 02/04/2016 | PGEHLEN1 | ENV SVCS | REVIEW | Approved |