Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP21-0147
Parcel: 121100020

Address:
4702 E GRANT RD

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP21-0147
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/17/2021 SBEASLE1 START PLANS SUBMITTED Completed
07/08/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Starbucks @ SEC Swan & Grant
Development Package (1st Review)
DP21-0147

TRANSMITTAL DATE: July 6, 2021

DUE DATE: June 26, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 14, 2022.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0144, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2-06.4.7.A.8 - For development package documents provide:

2. COMMENT: 2-06.4.7.A.8.d – As it appears you are using vehicle parking spaces with in the shopping center to meet the parking requirements, provide a vehicle parking space calculation that demonstrates that the existing center has excess spaces for this sites use.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. COMMENT: 2-06.4.9.H.5.a – As you are proposing offsite vehicle parking provided a parking space calculation that demonstrates that the existing shopping center has excess parking available.

4. COMMENT: 2-06.4.9.H.5.d – The long – term bicycle parking space calculation is not correct. Per UDC Article 7.4.3.F.4 when the required bicycle parking is based on Gross Floor Area (GFA) the GFA will include any outdoor area used to conduct the activity such as the patio. That said with the patio the GFA exceeds the 2,500 sf exception for the long – term bicycle parking and 2 long – term spaces are required. Revise the calculation and show the long – term location on the plan along with a detail that demonstrates how the requirements of UDC Articles 7.4.9.B & .D are met.

5. COMMENT: 2-06.4.9.O – The street perimeter yard setbacks listed under General Note 16 are not correct. Based on the definition of Established Area Setback any site that boarders on a street designated on the Major Streets and Routes (MS&R) Plan is consider to have Developing Area Setbacks. Per UDC Article 6.4.5.C.2 & Table 6.4.5.C-1 the required street perimeter yard setbacks are 21’ or the Height of the exterior wall, greater of the two, measured to the back of curb or future curb, whichever is more restrictive.

6. COMMENT: 2-06.4.9.R – As this site is considers part of the overall shopping center, as it can’t stand alone, per TSM Section 7-01.3.3.B a continuous pedestrian circulation is required from the proposed Starbucks to the other structures on site.

If you have any questions about this transmittal, please contact Elisa Hamblin or Elisa.Hamblin@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/09/2021 SBEASLE1 COT NON-DSD TRAFFIC Approved Email from: David.Stiffey@TucsonAz.gov
To: CDRC
Fri 7/9/2021 6:36 AM

Approved. No Comments.

David Stiffey
City of Tucson
07/09/2021 AWARNER1 LANDSCAPE REVIEW Reqs Change CDRC TRANSMITTAL
TO: Planning and Development Services Department, Plans Coordination
FROM: Anne Warner, PLA
PDSD Landscape/Native Plant Preservation Section

PROJECT: Starbucks
ACTIVITY NO: DP21-0147
Address: 4702 E Grant Rd
Parcel: 121-10-0020
Zoning: C-1
Existing Use: Minor Auto Service
Proposed Use: Food Service

TRANSMITTAL DATE: July 9, 2021
DUE DATE: July 14, 2021
COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed.
This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
1. UDC 2-10.4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.

2. The intent of the parking area tree requirement is to provide shade over the asphalt and for parked trees. Please relocate trees so the intent of the UDC section is met. It is acceptable to construct a planter in the parking area.
3. Provide tree parking area calculations. UDC 4.2.A.2.c.

4. Landscape borders require canopy trees, Caelsalpina mexicana is not a canopy tree, however it would be acceptable to add Palo Verdes in 5’ of the right of way to provide shade for the sidewalk and retain the design statement at the corner.

5. Coordinate with the civil/hydro engineer to maximize water harvesting from the building roof and hardscape to the landscape areas (solutions should be shown on both engineering and landscape plan) or provide a commercial Water Harvesting Plan.

6. Label sight visibility triangles on landscape plans.

7. Show future and existing rights of way for Swan and Grant Roads.

8. Provide a maintenance schedule for the landscape and irrigation in accordance with UDC 4.2.4.

9. Please provide a detail that shows installation of a root barrier adjacent to pavement.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package

If you have any questions, please contact me at anne.warner@tucsonaz.gov
07/14/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
07/14/2021 JVINCEN1 COT NON-DSD FIRE Approved
07/16/2021 SBEASLE1 COT NON-DSD REVIEW Approved Email from: Eric Latto
To: CDRC
Fri 7/16/2021 1:48 PM

I have reviewed the site plan and outside of increased traffic flow, I do not see any impact to our operations.

Eric Latto, Transit Service Coordinator
Department of Transportation and Mobility
City of Tucson
520-954-3717
07/28/2021 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. New sidewalk in the right-of-way must be 6 feet wide with 3 to 1 transitions to the existing sidewalk.
2. Show running and cross slopes on all sidewalks. Demonstrate ADA accessibility from the coffee shop to the right of way.
3. Show how water harvesting is maximized.
Loren Makus
loren.makus@tucsonaz.gov
07/29/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: lisa bowers
Thu 7/29/2021 8:58 AM

Returned for Corrections: DP21-0147
DESCRIPTION: Site/Grading - Starbucks at Grant/Swan Center.

FEES DUE: $ 1,642.30
Please pay at a minimum, the REVIEW Fees.
A payment is required before your next submittal.
ONLINE PAYMENT
If amount doesn't match "Fees Due", check back in a few hours after it is updated.
https://www.tucsonaz.gov/pdsd/fees
1- Click on: Pay Planning & Permit Fees
2- Enter Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave this field blank
4- "Continue"
5- In the Pay column - check the boxes
6- "Continue"

INCLUDE IN YOUR RESUBMITTAL
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your 2nd submittal documents according to this example: 2_Comment Response Letter, 07.01.21

FILEDROP
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
(Select "Existing Application", then enter permit number)

SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab and you will see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson, Planning and Development Services
Email for Development Pkgs: COTDSDpermits@TucsonAz.gov
(disregard the email response that will be sent automatically)
Email for Building Permits: PDSDinquiries@TucsonAz.gov