Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP21-0076
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
08/23/2021 | ELISA HAMBLIN | ZONING | REVIEW | Approved | |
09/15/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
09/17/2021 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
09/21/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
09/22/2021 | ALEXANDRA HINES | DESIGN PROFESSIONAL | REVIEW | Approved | AVP deferred submittal required as revision to DP21-0076. |
09/28/2021 | SBEASLE1 | COT NON-DSD | REVIEW | Approved | (See document in "Documents" section of PRO: "Transit Suntran, bus turn radius, 09.23.21") Email from: Bea Paulus To: CDRC Thu 9/23/2021 3:32 PM Attached is the turn radius of the Gillig buses to assist Perry Engineering in creating the turnaround at the end of Goret. Is the applicant planning on leaving the bus stop pullout in the current location? Would it be possible for the applicant to also provide a loading pad (25' wide, 8' deep from back of curb) on the north side of the street for a corresponding bus stop? The pad can be incorporated with the sidewalk. This would allow the bus to drop off passengers at the current stop, use the turn-around at the end of Goret, and pick up passengers across the street, on its way out, before the bus turns left onto Silverbell. The applicant is welcome to contact Bea Paulus at Sun Tran or Eric Latto with Transit Administration if they have additional questions, prior to final submission. Thank you. Bea Paulus Programs & Projects Manager Sun Tran 520-206-8826 bea.paulus@tucsonaz.gov |
09/28/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Approved | Email from: COTDSDPermits To: Ken Perry Cc: Natalee Perry Mon 9/27/2021 12:46 PM Returned for Corrections: DP21-0076 DESCRIPTION: Tentative Plat/FLD - Westbridge at Silverbell, 3196 N SILVERBELL RD Fee Balance: $0 (zero) Thank you for the payment. REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab and you will see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW INCLUDE IN RESUBMITTAL 1) Comment Response Letter (your response to any Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your FOURTH submittal documents according to this example: 4_Comment Response Letter, 09.01.21 FILEDROP for Resubmittal https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff Thank you. Sharon Beasley, Permit Specialist City of Tucson, Planning and Development Services Email for Development Pkgs: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) |
09/28/2021 | SBEASLE1 | COT NON-DSD | REVIEW | Approved | Email from: Davita.Mueller@tucsonAz.gov To: CDRC Tue 9/28/2021 7:47 AM Transit/Sun Tran gives their approval of the Plat for DP21-0076. We are assuming that the existing bus stop on the south side of Goret at Dales Crossing will not be altered as the roadway is extended. Thank you, Davita Mueller, Director of Service Planning & Development Sun Tran 3920 N. Sun Tran Blvd.; Tucson, AZ 85705 (520) 206-8825 |
09/28/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Approved | Email from: COTDSDPermits To: Ken Perry, Natalee Perry Tue 9/28/2021 8:23 AM PLAN APPROVAL NOTICE / Request for 4 documents and a virtual meeting MEETING & Letter: An Engineering Pre-construction Meeting (virtual, not in-person) is required before this permit can be issued. Also, per engineer Loren Makus, a letter from WAPA consenting to the development is required before this permit can be issued. PERMIT/ACTIVITY: DP21-0076 DESCRIPTION: Tentative Plat/FLD - Westbridge at Silverbell, a flexible lot development. Lots 1 thru 106, and Common Areas "A-1- thru A-5" (drainage, utility, open space), "B-1 thru B-6" (buffer yard, landscape, utility, drainage), and "C" (drainage, retention, utility, functional open space). 3196 N SILVERBELL RD FEE BALANCE: $0 (zero) Thank you for the payment. YOUR NEXT STEPS A. Email a request for an Engineering Pre-construction Meeting to: Loren.Makus@TucsonAz.gov and Stephen.Blood@TucsonAz.gov B. Reply to this email and attach: (Disregard the automatic email response that will be sent) 1. City of Tucson Permit - Check-marked and signed. See attached. 2. Letter of Intent from the Contractor: Includes the project title, project address, Activity Number, and Arizona ROC number with CR-2 or A-5 grading license classification. https://roc.az.gov/contractor-search 3. Fugitive Dust Activity Permit from Pima County DEQ at (520) 724-7400, http://webcms.pima.gov/cms/one.aspx?pageId=54362 4. Letter from WAPA consenting to the development After the meeting is completed and we receive the required documentation, please allow a few days for our staff to stamp the approved plans, upload them to PRO (www.tucsonaz.gov/pro), and send you a "Plan Issued" email. That email will include information regarding the approved stamped plans and required inspections. Thank you. Sharon Beasley, Permit Specialist City of Tucson, Planning and Development Services Dept. Email for Development Pkgs: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) |