Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP20-0231
Parcel: 12105018C

Review Status: Completed

Review Details: REVISION - - 2ND

Permit Number - DP20-0231
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/03/2022 SBEASLE1 ZONING REVIEW Reqs Change (The comments below were copied from the recent OK to Submit.)

PDSD TRANSMITTAL
FROM: PDSD Zoning Review
PROJECT: Copper State OBGYN Associates LTD
Development Package
(OK to Submit for Revision 2nd) DP20-0231

TRANSMITTAL DATE: May 16, 2022

COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

1. COMMENT: 2-06.4.9.O – Per UDC TABLE 6.3-3.A: DIMENSIONAL STANDARDS FOR THE O-1, O-2, & O-3 ZONES, O-3 Zone, Nores Use to Nonres Zone the required perimeter yard setback from the proposed covered parking structures is 10' or ¾(H), (H) = Height of the proposed exterior building wall, the greater of the two dimensions applies. Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. As heights to the highest point of the wall were not provided Zoning cannot determine perimeter yard setback requirements from the covered parking structures to the east and west property. Per UDC Article 6.4.5.D.1 Along interior property lines, this type structure extend two feet into the perimeter yard, provided the side or rear yard is not reduced to less than three feet: Show the required perimeter yard setback from a point that shows the allowed 2’-0 overhang to the east and west property line. If these structures do not meet perimeter yard setback a neighbor’s setback waiver may be secured to reduce the setback. Per UDC Article 6.6.2.D An accessory structure that exceeds the allowable height of a wall within a perimeter yard and is detached from a principal structure shall comply with the perimeter yard width standards of the principal structure, except that the accessory structure may be built to a parcel line with the consent of the adjoining or, when separated by an alley, adjacent property owner(s). To secure this neighbor setback waiver the following statement must be provided on the plot plan and be signed and dated by the adjacent property owner(s):
My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan.

Signature: _____________________________

Date: _________________________________
If you are not able to secure the waiver a Design Development Option (DDO) must be submitted and approved to reduce the required setback,

2. COMMENT: 2-06.4.9.O – Per UDC 6.4.5.C.1 Within established areas, the minimum required front street perimeter yard is 20 feet or one and one-half the height of the proposed wall (H), measured from the street property line. Per UDC Article 6.4.5.D.3 Architectural features that are part of a solar energy system may project up to four feet into required front perimeter yards. Provide street perimeter yard setback dimension from a point that shows the allowed 4’-0 overhang to the front street property line. If the front street perimeter yard setbacks are not met a Design Development Option (DDO) must be submitted and approved to reduce the required setback,

If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/03/2022 SBEASLE1 ENGINEERING REVIEW Approved Engineering was approved for the Revision #2 during the recent OK to Submit, by Mr. Loren Makus.
06/13/2022 AWARNER1 LANDSCAPE REVIEW Approved
06/14/2022 JPEELDA1 FIRE REVIEW Reqs Change New gates are shown on the DP. If gates are automatic they shall be provided with a KNOX box and KNOX gate key switch. A note shall be provided on the plans reflecting these requirements.

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
Tucson Fire Department
06/24/2022 SBEASLE1 ZONING-DECISION LETTER WRITE DECISION LETTER Reqs Change Email from: COTDSDPermits
To: L2Architect, T. Hadley
Fri 6/24/2022 9:11 AM

REVISION #2
REVIEW NOTICE

Returned for corrections, DP20-0231

Project Description: SITE - Copperstate OBGyn, building addition. 5550 E HAMPTON ST

REVISION #2
FEES DUE: $ 330.00
Please pay fees before sending in a resubmittal
ONLINE PAYMENTS
https://www.tucsonaz.gov/pdsd/fees
If amount doesn't match "Revision Fees Due", check back in a few hours after it is updated.
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5-Under the Pay column, check the boxes you want to pay
6- Click Continue, then enter your credit card info

VIEW the review comments and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEPS: Submit documents to the Filedrop
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
Select "Existing Application"
1) Comment Response Letter (your response to
the reviewer's Requires changes comments)
2) Plan Set (or individual sheets)
3) Any other items/documents requested by review staff

Thank you.
Sharon Beasley, Certified Permit Technician

City of Tucson, Planning & Development Services Dept.
Email: COTDSDpermits@TucsonAz.gov
(for development packages, land splits, Thursday Presubmittal meetings)
Email: PDSDinquiries@TucsonAz.gov
(for building permits)