Permit Number: DP20-0104
Parcel: 140420120

Address:
7010 S PLUMER AV

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP20-0104
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2020 SBEASLE1 START PLANS SUBMITTED Completed
05/18/2020 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.
05/18/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
05/18/2020 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
05/22/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved (The TEP Facilities Map mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

Tucson Electric Power Company (TEP) has reviewed and approved the development plan
submitted May 18 2020. It appears that there are conflicts with proposed improvements.
Burns & McDowell have been in contact with TEP and are aware of the conflicts and that relocation will
be bilalble to the customer.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing
facilities. Any relocation costs will be billable to the customer.
In order to apply for electric service, call the New Construction Department at (520) 918-8300.
Submit a final set of plans including approved site, electrical load, paving off-site improvements
and irrigation plans, if available include a CD with the AutoCAD version of the plans.
If easements are required, they will be secured by separate instrument. Your final plans should
be sent to: Tucson Electric Power Company
Attn: Mr. Richard Harrington
New Business Project Manager
P. O. Box 711 (OH 204)
Tucson, AZ 85702
520-917-8726


Should you have any technical questions, please contact the area Designer Martin Rodriguez, at (520) 991-5495

Sincerely,
Conor Mahoney, Office Support Assistant
Design/Build
05/26/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 3. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit.
05/26/2020 GDAURIA1 COT NON-DSD FIRE Completed
06/02/2020 ANDREW CONNOR LANDSCAPE REVIEW Approved
06/08/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: TIA - Tus Capital Improvement Project
Development Package (1st Review)
DP20-0104

TRANSMITTAL DATE: June 8, 2020

DUE DATE: June 16, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 17, 2021.

CONTENT REQUIREMENTS

1. 2-06.4.2.D - Provide the page number and the total number of pages in the package (i.e., sheet xx of xx on all sheets. The cover sheet shows "SHEET 1 OF 84" but there are 96 sheets in the plan. Also provide the sheet xx of xx within the drawing index for ease of maneuvering within the drawing set.

2. 2-06.4.3 - Provide the development package case number, DP20-0104 , adjacent to the title block on all sheets.

3. 2-06.4.4 - The project location map shall be drawn at a minimum scale of three-inch equals one mile

4. 2-06.4.4.C - Label the scale of the project location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

5. 2-06.4.7.A.4 - The existing and proposed use should be listed as Transportation Service: Airport Authority, subject to Use Specific Standard 4.9.113.Q.5

6. 2-06.4.7.A.6.a - Provide a general note on the cover sheet stating "THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.6 AIRPORT ENVIRONS ZONE (AEZ)."

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

7. 2-06.4.9.H.5 - Provide a width dimension for the entrance and exit access lane for the new vehicle parking shown on sheet CS101.

8. 2-06.4.9.H.5 - Sheet CS101 show the required 1'-0" setback from the proposed "PARKNG LOT SHADE CANOPY" to the PAAL, see UDC Article 7.4.6.F.2.a.(1).

9. 2-06.4.9.H.5 - Sheet CS506 Detail 4 the location dimension for the proposed wheel stop does not meet the requirements of UDC Article 7.4.6.H.3.

10. 2-06.4.9.H.5 - Sheet CS103 demonstrate on the plan that the requirements of UDC Article 7.4.6.F.4 are met for the area south of the proposed accessible parking space and the fence & 6" guard post.

11. 2-06.4.9.H.5 - Sheet CS506 Detail 4 & 5 provide a location dimension for the proposed wheel stops.

12. 2-06.4.9.H.5 - Sheet CS506 Detail 4 clearly demonstrate that the proposed accessible signs do not encroach into the 2'6" vehicle overhang.

13. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

14. 2-06.4.9.R - Sheet CS101 there is an existing accessible access ramp shown just southwest of the proposed accessible parking spaces that appears it will not meet cross slopes for an accessible route.

15. 2-06.4.9.R - Sheet CS101 show the proposed accessible ramp called out under Keyed Note 3 on the plan.

16. 2-06.4.9.R - Sheet CS103 provide a width dimension for the striped area between the vehicle parking spaces.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/10/2020 SBEASLE1 PIMA COUNTY ADDRESSING Approved DP20-0104 Tucson Fuel Facilities, 1st Submittal, is Approved by Pima County Addressing however please note the new address 7073 S Plumer Av has been issued for the Fuel Facility.
Please let me know if you have any questions.
Thank you,

Robin Freiman, Addressing Official
Pima County Development Services Department
(520) 724-7570
06/11/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. On sheet CS101 keynote 1, indicating a parking canopy, is shown in the middle of the PAAL. Please clarify what is intended.
2. Clearly show how water harvesting will be maximized. (UDC 7.6.6.C.2)
Loren Makus, EIT
loren.makus@tucsonaz.gov
06/15/2020 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA, Landscape Architect
Tucson Parks and Recreation
(520) 837-8040
06/16/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
06/17/2020 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved June 16, 2020

RE: DP20-0104 / Site / Grading / SWPPP / DDO - Tucson Fuel Facilities, TUS Capital Improvement Project / 1st Submittal, Received May 18, 2020

Thank you for the opportunity to comment on DP20-0104, Tucson Fuel Facilities, TUS Capital Improvement Project, 1st Submittal, a development package application for an approximately 2.38 acre site, located south of the intersection of East Airport Drive and South Plumer Avenue. The property is zoned Heavy Industrial Zone (I-2) and Mixed Use Zone (MU), with the proposed development being a new fuel storage facility at Tucson International Airport (TUS).

This site is within FAA traffic pattern airspace and FAA Part 77 airspace.

The Tucson Airport Authority conditionally approves the subject request and has no comments to provide during this submittal of the project. The Tucson Airport Authority requests to be included on subsequent submittals of this project.

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, C.M. , Senior Airport Planner

cc: Lorraine Behr, TAA
06/18/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change RETURNED FOR CORRECTIONS NOTICE
Your Next Step: Resubmittal of documents

DESCRIPTION: Site/Grading/SWPPP/ DDO - Tucson Fuel Facilities, Tus Capital Improvement Project.

PERMIT/ACTIVITY: DP20-0104
FEE BALANCE: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on blue icon to the right of each document

YOUR NEXT STEP: Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd

FOR FASTER PROCESSING, when on the Filedrop page, select the box
"Development Package or Land Division". This applies to all
DP submittals, DP resubmittals, and DP revisions - and all Land Splits.
(For Building Permits, continue to select "Resubmittals/Revisions...".)

1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the
submittal number, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov
06/18/2020 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
06/18/2020 SBEASLE1 OUT TO CUSTOMER Completed