Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP20-0006
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/28/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
02/28/2020 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | February 28, 2020 RE: DP20-0006 / SITE/GRADING/SWPPP - TEP, Phase 2, Irvington Facilities, operations center and office / 2nd Submittal, Received February 28, 2020 Thank you for the opportunity to comment on DP20-0006, TEP, Phase 2, Irvington Facilities, operations center and office; 2nd Submittal, a development package application for an approximately 4.4 acre site, located southwest of the intersection of South Swan Road and East Irvington Road. The property is zoned Planned Area Development 34 (PAD-34), with the proposed development being operations and office buildings for TEP. This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 2nd submittal of this project and has no additional comments to provide. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner |
03/02/2020 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | DP20-0006, TEP, Phase 2, Irvington Facilities, operations center and office, 2nd Submittal is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
03/05/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
03/06/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
03/06/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
03/12/2020 | DAVID RIVERA | ZONING | REVIEW | Approved | |
03/13/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Approved | PLAN APPROVAL NOTICE / Request for documents NOTE: An Engineering Pre-construction Meeting is mandatory before permit can be issued. Project will require EOR certification prior to final inspection. Please follow the steps below to finalize the approval process DESCRIPTION: SITE/GRADING/SWPPP - TEP, Phase 2, Irvington Facilities, operationscenter and office. PERMIT: DP20-0006 FEE BALANCE: $0 (zero) YOUR NEXT STEPS Attend the mandatory meeting. Reply to this email and attach the following documents. 1. City of Tucson Permit, checkmarked and signed (see attached). Before signing, double-check information for accuracy (owner name, etc.). 2. Letter of Intent from the Contractor: Includes the project title, project address, Activity Number, ROC license number 3. Fugitive Dust Activity Permit: Contact Pima County DEQ at (520) 724-7400, http://webcms.pima.gov/cms/one.aspx?pageId=54362 4. Attend an Engineering Pre-construction Meeting. To schedule, contact: Loren.Makus@TucsonAz.gov or (520) 837-4927 AFTER REPLYING with the required documents and attendingthe meeting, allow a few days for our staff to stamp the plans, upload them to PRO (www.tucsonaz.gov/pro), and send you a "Plan Issued" email notification. That email will include a webpage link to the approved stamped plans and a list of requiredinspections. Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, 2nd Floor Tucson, AZ 85701 email: COTDSDPermits@TucsonAz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/13/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |