Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0170
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/22/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
07/23/2019 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | Regional Traffic Engineering has no comments on this submittal and supports is acceptance. The project will have no impacts to any ADOT facilities. Thank you. Tom Martinez TMartinez@Azdot.gov |
07/29/2019 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
08/09/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
08/13/2019 | PCAMARE1 | ZONING HC | REVIEW | Reqs Change | See Zoning comments |
08/13/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
08/13/2019 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Paul Camarena PDSD Zoning Review Section PROJECT: EL Rio Manning House Entry Circle - Park Development Package (1st Review) 450 W PASEO REDONDO DP19-0170 - PAD-2 Zoning TRANSMITTAL DATE: August 13, 2019 DUE DATE: August 19, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 18, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section 2-06.3.0 FORMAT REQUIREMENTS CONTENT REQUIREMENTS 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 1. COMMENT: Provide the development package case number, DP19-0170, adjacent to the title block on each sheet. 2-06.4.6 - If the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced-scale map of the PAD on the first sheet, indicating the location of the portion being developed. 2. COMMENT: Provide a scale map of the PAD on the first sheet as per the standard above. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 3. COMMENT: Is this park for private or public use? 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 4. COMMENT: If applicable provide the information for the standard above. 2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval. 5. COMMENT: If applicable provide the information for the standard above 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 6. COMMENT: The entire length of the sidewalk path from the circular area to the boundary shall be 4ft wide. Please revise the key note 11 on sheet 3 to state stabilized decomposed granite as noted in detail 5 on sheet 9. 2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any. 7. COMMENT: As this project is located within in the Rio Nuevo and Downtown Zone Rio Nuevo Area (RNA) review is required prior to approval of the DP. Once approved provide the RNA case number adjacent to the title block on all sheets and provide a general note stating the RNA case number, date approved and any conditions of approval. If you have any questions about this transmittal, Contact Paul Camarena at (520) 791-5550 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
08/19/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The development package will contain the following identification in the lower right corner of each sheet: Any relevant case numbers for reviews or modifications that affect the site. Provide Case # DP19-0170 on each sheet Indicate graphically, where possible, compliance with conditions of the PAD document. ARTICLE 7: DEVELOPMENT STANDARDS 7.6. LANDSCAPING AND SCREENING Use of the Public Right-of-Way Non-required landscaping may be placed in the public right-of-way, if the following standards are met: 1. The landscaping is approved by the City Engineer or designee and complies with the City Engineer's standards on construction, irrigation, location, and plant type; 2. All vegetation complies with the standards of Section 7.6.4, Landscaping Standards; and, 3. The landscaping does not interfere with the use of the sidewalk. Obtain permission for use of the ROW Ensure that all Zoning and Engineering comments and concerns are addressed. Additional comments may apply |
08/22/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Passed | |
08/23/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE - The reviews have been completed - A resubmittal is required Permit/Activity Number: DP19-0170 Description: SITE - El Rio Manning House entry circle. The fee balance is $0 (zero). Thank you for your payment. To view the review comments: www.tucsonaz.gov/PRO, enter Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (listing your response to reviewer's comments) 2) Plan Set (all pages, full set) 3) Any other items requested by review staff Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
08/23/2019 | TOM FISHER | COT NON-DSD | TDOT | Reqs Change | TDOT Landscape 1. Please verify that the Irrigation System servicing the circle is functioning and will support the proposed vegetation. 2. Verify that the sleeve to the circle is intact under the roadway. 3. The circle is privately owned and removal and maintenance of vegetation is the responsibility of the owner. Take all traffic control precautions and procure all necessary permits for any work/machinery that will occur within the ROW. Thank you, David Marhefka da’-vid mär-hef’-ka Landscape Architect City of Tucson Department of Transportation (o) 520-837-6618, (m) 520-403-5074 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/23/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |