Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP19-0054
Parcel: 13213087F

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP19-0054
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/22/2019 SBEASLE1 START PLANS SUBMITTED Completed
06/07/2019 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved June 7, 2019
Sharon Beasley, Permit Technician
City of Tucson
Public Works Buildings - 201 North Stone Avenue
Tucson, AZ. 85701
RE: DP19-0054 Shops E2, 2nd Submittal, Received May 21, 2019
Dear Ms. Beasley,
Thank you for the opportunity to comment on DP19-0054, Shops E2, 2nd Submittal, a development package application for an approximately 1.73 acre site, located southwest of the intersection of ML King Jr Way and East Tucson Marketplace Boulevard. The property is zoned Planned Area Development 15 (PAD-15), with the proposed development being a future commercial, office, and retail use.
This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The Tucson Airport Authority is satisfied with the 2nd submittal of the project and has no additional comments to submit.
Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, Senior Airport Planner
06/12/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/18/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
06/18/2019 LOREN MAKUS ENGINEERING REVIEW Approved
06/19/2019 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved
06/19/2019 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved
06/19/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL
TO: Development Services Department
Plans Coordination Office
FROM: David Rivera
PDSD Zoning Review Section
PROJECT: Shops E2 at Tucson Market Place - Commercial / Retail/ Office
Development Package (1st Review) 1500 E. Tucson Market Place Boulevard
DP19-0054 - PAD 15
TRANSMITTAL DATE: June 19, 2019
DUE DATE: June 20, 2019
COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 4, 2020.
SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section
2-06.3.5 - A three-inch by five-inch space shall be reserved in the lower right quadrant of each sheet for an approval stamp.

1. COMMENT: Remove the Development Package PDSD approval stamp from all sheets. Reserve a three-inch by five-inch space in the lower right quadrant of each sheet for an approval stamp. The approval stamp will be applied electronically by PDSD staff.
CONTENT REQUIREMENTS
2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines.

2. COMMENT: The information as noted above for James Jones and Eric Barrett must be listed on the cover sheet.
List the email addresses for the owner/developer, Engineer, and Architect.
2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

3. COMMENT: The administrative street address must be listed next to the title block of al plan sheets.
2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.
2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.
2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

4. COMMENT: It does not appear that the required short term bicycle parking spaces along the west side of the building have been distributed to meet the fifty foot distance to each public entrance.
An exception can be requested: (1) Exception - The PDSD Director may allow short-term bicycle parking to be more than 50 feet from a public entrance(s) based on a finding from the City of Tucson's Bicycle Coordinator or designee that the proposed location is consistent with best practices pertaining to siting short-term bicycle racks, particularly in regards to visibility, security, and convenience for bicyclists.
Contact Andrew Bemus, Bicycle coordinator with TDOT at 837- 6596 to request a determination for the proposed locations. The determination is to be presented to the PDSD Director for approval.

If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/20/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
The fee balance is $0 (zero).
Activity Number: DP19-0054
Project Description: SITE/GRADING/SWPPP - Shops E2, Tucson Marketplace, Phase 5, Portion of Lot 3.
For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
After all corrections are made, please name your 3rd submittal documents accordingly, for example: 3_Plan_Set.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to)
2) Complete Plan Set (all pages, full set)
3) Any other items requested by review staff
After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The Project Manager can be contacted at: Loren.Makus@TucsonAz.gov, (520) 837-4927
Thank you.
Sharon Beasley, Permit Technician

City of Tucson
Planning and Development Services
Attn: Permit Counter
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
06/20/2019 SBEASLE1 OUT TO CUSTOMER Completed