Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - DP19-0034
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/13/2020 | SBEASLE1 | ZONING | REVIEW | Reqs Change | (Review comments from Okay to Submit) CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields, Section Manager PROJECT: TEP Kino Substation Development Package (2nd Revision), DP19-0034 TRANSMITTAL DATE: April 13, 2020 DUE DATE: Revision #2 Ok to Submit. COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 2-06.4.0 CONTENT REQUIREMENTS 1. 2-06.4.2.D - The last sheet provided in this set shows sheet "24 of 27", if this is the last sheet should in not be "27 of 27"? 2. 2-06.4.2.D - All sheets provided in the revision set should have the total number of sheets updated to reflect "27". 3. 2-06.4.5 - The drawing index should have the total number of sheets updated to match the 27 provided. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 4. 2-06.4.9.L - An access easement is required for "DECORATIVE PAVER" area shown on the plan. Provide the recordation information on the plan. 5. 2-06.4.9.W - A separate sign permit will be required for the signage shown on the monument wall. 6. Clarify why sheets that are not being revised have been provided in this set. 7. The provided revision letter references sheet "18A" but no sheet "18A" was provided in the drawing set. 8. The provided revision letter references sheet "27" but no sheet "27" was provided in the drawing set. 9. Provide documentation that the Bridges Design Review has seen and approved the proposed revision. If you have any questions about this transmittal, please contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
04/13/2020 | SBEASLE1 | ENGINEERING | REVIEW | Approved | Approved by Loren Makus, 04/10/2020 (see Okay to Submit). |
04/30/2020 | SBEASLE1 | ZONING-DECISION LETTER | WRITE DECISION LETTER | Reqs Change | REVISION #2 PLAN RETURNED FOR CORRECTIONS NOTICE - A resubmittal is required Project Description: SITE/GRADE/SWPPP - TEP Kino Substation. Permit: DP19-0034 Project Manager: Steve.Shields@TucsonAz.gov Fee Balance: $0 (zero) View the reviewer's comments and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, left side, Activity Search, enter the Activity Number - Permits section, click on blue tab - Documents section, click on blue icon to the right of each document - Reviews section, click on Review Details After the corrections are made, please name your Revision #2, 2nd submittal documents accordingly, for example: REV-2_2_Plan_Set. YOUR NEXT STEPS: Submit the following items to the Filedrop- https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's Requires changes comments) 2) Plan Set (or individual sheets) 3) Any other items requested by review staff CONTACT US Monday-Friday, 8:00 am to 12:00 noon https://www.tucsonaz.gov/pdsd/virtual-service-counter To request information or an over-the-counter review, sign in to the Virtual Service Counter and we will give you a call. Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services email: COTDSDPermits@TucsonAz.gov |
04/30/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/30/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |