Permit Number: DP19-0014
Parcel: 141114050

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP19-0014
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/09/2019 SBEASLE1 START PLANS SUBMITTED Completed
05/28/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/06/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
06/07/2019 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: Lot 42 Brown/Rita Ranch, 9013 E Old Vail Rd
Development Package (2nd Review)
DP19-0014

TRANSMITTAL DATE: June 7, 2019
DUE DATE: June 7, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 22, 2020.

1. This comment was not addressed correctly. Based on my count there are only 79 vehicle parking spaces on site, 67 standard and 12 accessible. Clarify. 2-06.4.9.H.5.a - On sheet 1, under General Note 27, list the use as "Industrial" only. Verify the number of spaces listed as provided is accurate. A count of spaces labeled on sheet 2 indicates 70 total spaces (including 12 accessible spaces) not 76 total as indicated.

2. This comment was not fully addressed. Per TSM Section 7-01.3.3.A & 7-01.4.1.A a sidewalk is required to from this project to all streets that the project has frontage. Provide a sidewalk from the site out to Rita Road. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. At least one sidewalk is required to a project from each street on which the project has frontage. The sidewalk should be located to minimize any conflict with vehicular access to the project. Provide dimensions for all sidewalks provided on site, including existing sidewalks near buildings 1-4. Additionally, a sidewalk is required adjacent and parallel to any access lane or PAAL on the side where buildings are located.

3. 2-06.3.12 - The drawing index does not appear to be correct as the index only shows 10 sheets and the plan set has 11.

4. 2-06.4.2.D - The sheet number x of 10 is not correct as 11 sheets were provided in the plan set.

5. 2-06.4.9.G - As you are proposing a phased project, see sheet 2, provide calculations, vehicle & bicycle parking, etc., to indicate that each phase complies with all requirements as a separate entity.

If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/07/2019 SSHIELD1 ZONING HC REVIEW Approved
06/10/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP19-0014

1) Previous comment 4. Keynote 13 is missing being called out in several planters where roof drains are located. Please go through and double check placement of keynote 13
2) Engineering can perform an expedited review once the above comments have been addressed and a new work flow opened
06/11/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Activity Number: DP19-0014
Project Description: SITE/GRADING/SWPPP - Lot 42 Brown/Rita Ranch.
For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
After all corrections are made, please name your 3rd submittal documents accordingly, for example: 3_Plan_Set.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to)
2) Complete Plan Set (all pages, full set)
3) Any other items requested by review staff
After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero).
The Project Manager can be contacted at: Andrew.Connor@TucsonAz.gov, (520) 837-4950.
Thank you.
Sharon Beasley, Permit Technician

City of Tucson
Planning and Development Services
Attn: Permit Counter
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
06/11/2019 SBEASLE1 OUT TO CUSTOMER Completed