Permit Number: DP18-0280
Parcel: 133200160

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0280
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/06/2019 SBEASLE1 START PLANS SUBMITTED Completed
03/01/2019 MASHFOR1 COT NON-DSD FIRE Approved The building is not sprinklered and it is not required to be. However, a new Fire Hydrant is required to be within 600 ft of the structure, and there is no Fire Hydrant that currently meets this standard.

Please provide new Fire hydrant for necessary water supply for this proposed building. Please supply this location and note on the revision.
03/01/2019 MASHFOR1 COT NON-DSD FIRE Approved Per my phone conversation with Alberto Navarro from Cypress the building will have a Fire Sprinkler system installed.

The building is not sprinklered and it is not required to be. However, a new Fire Hydrant is required to be within 600 ft of the structure, and there is no Fire Hydrant that currently meets this standard.
03/04/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
03/04/2019 SSHIELD1 ZONING HC REVIEW Approved
03/04/2019 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP18-0280 Arizona Vascular Specialists / 2ndSubmittal is Approved by Pima County Addressing.
Please note that a Lot Consolidation is needed for 133-20-0160 and 133-20-0170 since the proposed building is located on both parcels.Thank you,

Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV, 4th Floor, Tucson, AZ 85701
03/04/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change In Lieu of a directional median at the east driveway, signage to indicate right turn only will be required.

After further review new 6 foot sidewalk along Speedway as noted in the rezoning requirements will be required.

The driveway shows a moderate slope towards the street and is complaint with ADA if it is correctly shown. Missing grades may not show the true conditions. A pedestrian path meeting ADA should be shown crossing with slope information for any return type driveway so the grades are maintained and constructed in the field.

The curb access ramps leave it to be scaled to verify slopes. At this scale, it is not verifiable. We should have stationing and outs along with grades as part of a table for all curb access ramps.

The grades shown in the gutter at the new driveway indicate ponding. Fix this as part of the new curbing. No design is proposed or grade information is shown. Since curbing is required and drainage is an issue, a PIA is needed.

Any deviations from our standards require a TSMR. This would include the driveway location. We should make sure this gets tracked that way.

If you have any questions contact me at zelin.canchola@tucsonaz.gov or 520 837 6659
03/04/2019 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: Arizona Vascular Specialists
Development Package (2nd Review)
DP18-0280

TRANSMITTAL DATE: March 4, 2019

DUE DATE: March 5, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 18, 2019.

7. The "EXISTING PUBLIC UTILITY EASEMENT" shown underneath the proposed building will need to be abandoned will need to be abandoned prior to approval of the DP. 2-06.4.8.B - Verify all easements are drawn on the plan. All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

9. This comment was not addressed, no documents provided for the combination. The north/south property line is still shown through the building. As access is proposed across the property to the west a recorded cross access/parking agreement is required. 2-06.4.9.E - Proposed land splits or existing lot lines shall be drawn on the plan with dimensions and the identification number and approximate square footage of each lot. A lot combination will be required for this project. If a lot combination has already been completed, provide documentation with the next submittal.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/08/2019 LOREN MAKUS ENGINEERING REVIEW Approved
03/11/2019 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved CONCURRENT REZONING -- Cannot sign plans until 30 days after rezoning is approved by M&C.
03/12/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Activity Number: DP18-0280
Project Description: E SITE/GRADING/SWPPP - Arizona Vascular Specialists
To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. Name your documents in the following manner - a 3rd submittal document would be titled: 3_Plan_Set.
After the necessary corrections have been made, submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd
In the Project Description field, enter the Activity Number.
After submittal, the plans will then re-enter a 20-working-day review cycle.
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
Please pay the assessed fees, or the Review fees at a minimum, at the permit counter or mail a check (payable to the City of Tucson, address is shown below) prior to the completion of the next review. Include the Activity Number on your check stub. The fee balance is $165.00 (see the Balance column in the image below).
Maria Gayosso, copied, is the Project Manager to contact with any questions, email: Maria.Gayosso@TucsonAz.gov or phone: (520) 837-6972.
Thank you.
City of Tucson
Planning and Development Services
Attn: Sharon Beasley
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
03/12/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: March 14, 2019

TO: John Beall FROM: Alexandra Hines
Rezoning Section Manager Lead Planner

SUBJECT: C9-18-20 - AZ Vascular Specialists, R-1 to O-1
DP18-0280 - Arizona Vascular Specialists


Please be advised that CDRC has conditionally-approved the above mentioned development package. The development package proposes a medical service - outpatient. The property is approximately 1.27 acres. The building square footage is approximately 14,000 square feet with a building height of 16 feet. The existing zoning is R-1 and the proposed zoning is O-1. Conditions of rezoning per the decision of the Mayor and Council are hereby met. A copy of the development package is included. The ordinance may be scheduled for Mayor and Council adoption at any time.

If you need additional information, please contact me at (520) 837-6975 or alexandra.hines@tucsonaz.gov.
03/12/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Conditional Approval Notice: DP18-0280
Description: E SITE/GRADING/SWPPP - Arizona Vascular Specialists
All reviewers have completed review of the development package. The development package is conditionally-approved until 30 day period after the rezoning approval by Mayor & Council.

As the applicant, please address the remaining review comments in a resubmittal. Also, remind us when the 30 days near. At that time, we will check if Mayor & Council adopted the conditions without change and you will receive a notification email that plans are approved to obtain the permit for the development package.
Please resubmit development package to address the remaining comments. You can address now or wait if you think any changes will come from the Mayor & Council public hearing.

Attached: CDRC Conditional-Approval Memo
Development Package Plan Set
Alexandra Hines, AICP
Lead Planner at Planning and Development Services, City of Tucson
201 N Stone Ave 1st Floor, Tucson, AZ 85701
(520) 837-6975 - alexandra.hines@tucsonaz.gov
PDSD Website

Final Status

Task End Date Reviewer's Name Type of Review Description
03/12/2019 SBEASLE1 OUT TO CUSTOMER Completed