Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP18-0132
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/16/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
08/16/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP18-0132 1) Engineering has no further comments, however the plans cannot be approved until the final Zoning and Landscaping comments have been addressed. Engineering can conduct an over the counter review once the outstanding reviews are complete. Call or Email to schedule John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
08/16/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | Per Zoning Comments: Previous Comment regarding building expansion: Expansion must be listed under the building areas text block section. (the ratio/percent of square footage proposed versus what is existing) 2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and, Under the building area notes section, include an expansion calculation based on the proposed SF to existing SF. Remove the reference to Floor area Ratio as there is no limit to the square footage in the UDC. (The building size is limited only by setbacks, height limitations, landscape buffers and parking and loading are requirements.) Provide correct expansion calculations. Ensure that all Zoning comments are addressed. Additional comments may apply |
08/16/2018 | DAVID RIVERA | HC SITE | REVIEW | Approved | |
08/16/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: SION Power Test Equipment Building - Use is Unclear as of this review Development Package (1st Review) DP18-0132 - I-1 Zoning TRANSMITTAL DATE: August 9, 2018 DUE DATE: August 17, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 1, 2019. 1. Follow Up To Previous Comment 8: Remove the words "Case #" from the title block. It should state DP18-0132. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. PREVIOUS COMMENT 8: Provide the development package case number, DP18-0132, adjacent to the title block on each sheet. 2. Follow Up To Previous Comment 14: The building expansion must be listed under the building areas text block section. (the ratio/percent of square footage proposed versus what is existing) 2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and, PREVIOUS COMMENT 14: Under the building area notes section, include an expansion calculation based on the proposed SF to existing SF. Remove the reference to Floor area Ratio as there is no limit to the square footage in the UDC. (The building size is limited only by setbacks, height limitations, landscape buffers and parking and loading are requirements.) 3. Follow Up To Previous Comment 16: The plan must include the area that is 50 feet beyond the property boundaries. Draw on the plan what is within the 50 feet beyond the west property line. The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. PREVIOUS COMMENT 16: Provide the information along the west perimeter property boundary as noted by the standard above. (It appears that the area within fifty feet is mainly driveways and landscaping.) 4. COMMENT: The remaining zoning comments are minor and can be reviewed over the counter with an appointment if the applicant wishes to do so. Please call in advance if the applicant wishes to have the Plans approved by zoning over the counter; this is assuming that all reviewers have approved the DP. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |