Review Date Reviewer's Name Type of Review Description Status Comments
05/21/2018 MMORENO1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Michael Moreno
PDSD Zoning Review Section

PROJECT: Dutch Bros
Development Package (2nd Review)
DP18-0056

TRANSMITTAL DATE: May 21, 2018
DUE DATE: May 30, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March, 2019.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.3.0 FORMAT REQUIREMENTS


2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

1. COMMENT: Provide the dimensioned width of paving, curbs, curb cuts, and sidewalks along Golf Links Road and provide the dimension sidewalk width adjacent to the east drive thru lane, all pedestrian walk ways must be a minimum of 4 feet.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

2. COMMENT: Please provide a detail drawing and the proposed location for the long term bicycle parking.

3. COMMENT: Please submit a cross access agreement document for the proposed development

4. COMMENT: Please draw the building foot print on sheet 1 and 2.

5. COMMENT: Please remove the electrical sheets 15-18 from the development package.

6. COMMENT: Provide the docket and page number for the electrical power easement on all applicable sheets.

7. COMMENT: There must be a minimum 4 foot pedestrian sidewalk connecting to the trash disposal. Per Section 7-01.3.0 PEDESTRIAN CIRCULATION PATH REQUIRED
B. The areas within the development which must be connected include, but are not limited to, all buildings, all bicycle and vehicle parking areas, all recreation areas, all dumpster areas, and all other common use areas.


If you have any questions about this transmittal, Contact Michael.Moreno@Tucson.az.gov at any time during the week.
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
05/22/2018 ANDREW CONNOR NPPO REVIEW Approved
05/22/2018 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond UNIFIED DEVELOPMENT CODE
4.1 Identification and Descriptive Data
A. All improvements and site information, such as buildings and site infomation, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
5.11 Conflicts with Utilities
Trees and shrubs must be selected and located so that, at maturity, they do not interfere with existing on-site or off-site utility service lines or utility easements.

Verify there no conflicts with electrical easement to the East.

Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval.
05/24/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/29/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0056

1) Previous comment 1; Sheet SP1.3 detail 13. Detail references incorrect standard. Revise detail per previous comment. Provide waste stream calculations
2) Previous comment 2; Sheet SP1.3 detail 5. Detail still references Town of Gilbert Standards and shows incorrect ground clearance. Revise per previous comment
3) Previous comment 3; Response indicates that a note was added to detail 3. Comment regarded detail 5. No added note can be found. Update per previous comment
4) Previous Comment 7. Response to comment 7 indicates that simply the reference to the report was added, and that the report was not reviewed, "Contacted Rick Engineering but they were unable to supply a copy of the report for the center." Confirm that the report was reviewed. If not, a copy of the report is available for pickup City of Tucson Planning and Development Services. 201 N Stone, Tucson AZ.

John Van Winkle, P.E.