Permit Number: DP17-0241
Parcel: 109224450

Address:
5590 E RIVER RD

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP17-0241
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/06/2017 ARUIZ1 START PLANS SUBMITTED Completed
10/06/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Revise the site drawing to include the following existing utility information:
a. The location of fire hydrants.
b. The location and size of sanitary sewers, including the pipe diameter and the invert and rim elevations of all manholes and cleanouts along with the Pima County Wastewater Management Department (PCWMD) reference number.
Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012.
10/06/2017 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Passed Agency notified for info only.
10/06/2017 ALEXANDRA HINES OTHER AGENCIES PIMA ASSN OF GOVTS Passed Agency notified for info only.
10/06/2017 ALEXANDRA HINES UTILITIES SOUTHWEST GAS Passed Agency notified for info only.
10/06/2017 MARTIN BROWN COT NON-DSD FIRE Approved
10/06/2017 ALEXANDRA HINES OTHER AGENCIES U. S. POST OFFICE Passed Agency notified for info only.
10/19/2017 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
10/25/2017 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP17-0241 10/25/2017

(X) Final Plat
() Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations



SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

(X) Approval
() Denied
() Rezoning history on site
() Annexation history on site
() Tentative Plat
() Development Plan
() Landscape Plan
() Other







REVIEWER: MM
DATE: 10/25/2017

COMMENTS

Site is addressed 5590 E River Rd and is currently being reviewed for DP17-0241. Site is zoned PAD 22 Rio Verde Village and is in compliance with Plan Tucson.
10/30/2017 KELLY LEE ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Kelly Lee
Lead Planner

PROJECT: Rio Verde Village Block 2 Development
Development Package (1st Review)
DP17-0241

TRANSMITTAL DATE: October 31, 2017

DUE DATE: October 31, 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 3, 2018.


1. 2-06.4.1 -Please provide owner contact information, including phone and email.

2. 2-06.4.3 - Provide the development package case number, DP17-0241 , adjacent to the title block on all sheets.

3. 2-06.4.4.A - The subject property needs to be centered on the location map.

4. 2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. The width of the short term bike parking is not shown on the detail. Please add.


5. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. Is the reference to food and beverage correct? It appears the land use is supposed to be classified as food service as you have identified a patio for seating. Please confirm.

2-06.4.7.A.8 - For development package documents provide:

6. 2-06.4.7.A.8.a - Please add land use labels on Building1 (sheet 2) and associated square footage. Please also revise the following: Note #12 on sheet: Revise disabled to accessible. Note #3 revise to: The proposed land use is..

7. 2-06.4.8.A- FOR BLOCK 2- Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system.


8. 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. Please provide for River Road.

9. 2-06.4.9.F - Label Block 4 to the east on Sheet 2


10. 2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section.


11. 2-06.4.9.H.5.a - If the proposed land uses is for Commercial Use Group/ Food service, it should be parked per UDC Section 7.4 at 1 per 100 sf of building square footage. Please confirm you have adequate parking for a food service land use. Please also review the overall vehicle parking calculations on sheet 1.

The typical van parking space detail provided on sheet 2 should be a minimum 96 inches in width where adjacent access aisle is 96 inches. Other option is 132 inches where adjacent to 60 inch access aisle.

12. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

13. 2-06.4.9.R I would recommend you reviewing the pedestrian refuge area on the east side of the building. Would you consider extending the pedestrian area along natural grocers to the north along the new building? This would be a safer pedestrian design.

14. 2-06.4.9.R -Add more detail to the proposed signage, including height.

15. 2-06.4.9.S- Show existing accessible ramp and pedestrian access from River Road to new development.

16. The abandonment of the portion of the existing water easement will need to completed prior to approval of the development or another option is putting a hold will put on the CofO.

17. Provide cross and longitudinal slopes for all new sidewalks.

If you have any questions about this transmittal, please Name, (520) 837-6999 or Kelly.Lee@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
10/31/2017 KLEE1 ZONING HC REVIEW Reqs Change See Zoning Comments
10/31/2017 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change UNIFIED DEVELOPMENT CODE
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
The site plan indicates that thrash enclosures are outside of riparian habitat limit, Sheets 3 and 4 indicate that the enclosures encroach into Regulated Riparian Habitat.
Verify impact to RRH.
Rio Verde Village
Planned Area Development
Regulated Riparian Habitat (RRH)
The project shall be permitted to impact existing RRH along the unnamed
tributary wash as needed and be allowed to provide mitigation for impacts to the
regulated riparian habitat both on-site and off-site on property owned or under
control of the applicant that is located in the same general area of the site and
provides enhanced riparian habitat and vegetation to the Tanque Verde Creek
area.
On-Site Areas
On-site mitigation areas may include areas along the top of the no-name
wash, the southern boundary adjacent to the future riverpark or
other areas that meet the intent of riparian habitat mitigation.
If affecting RRH verify mitigation for encroachment.
Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval.
Additional comments may apply.
10/31/2017 GLENN HICKS COT NON-DSD PARKS & RECREATION Approved No Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation
(520) 837-8040
Howard.Dutt@tucsonaz.gov
10/31/2017 LOREN MAKUS ENGINEERING REVIEW Approved
10/31/2017 ANDREW CONNOR NPPO REVIEW Reqs Change Rio Verde Village
Planned Area Development
Regulated Riparian Habitat (RRH)
The project shall be permitted to impact existing RRH along the unnamed
tributary wash as needed and be allowed to provide mitigation for impacts to the
regulated riparian habitat both on-site and off-site on property owned or under
control of the applicant that is located in the same general area of the site and
provides enhanced riparian habitat and vegetation to the Tanque Verde Creek
area.
On-Site Areas
On-site mitigation areas may include areas along the top of the no-name
wash, the southern boundary adjacent to the future riverpark or
other areas that meet the intent of riparian habitat mitigation.
If affecting RRH verify mitigation for encroachment.
11/01/2017 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
11/02/2017 ARUIZ1 OUT TO CUSTOMER Completed