Permit Details

Status:
Complete
Type:
Development Package
Address:
5590 E RIVER RD
Address NEW:
5590 E RIVER RD
Apply Date:
10/03/2017
Applicant:
Marty Magelli
Description:
SITE/GRADING - Rio Verde Village, Block 2 development, medical office and general office/retail.

Permit Reviews

Permit Number - DP17-0241
Permit Status: Complete
Permit Description: SITE/GRADING - Rio Verde Village, Block 2 development, medical office and general office/retail.
Start Date Submittal Complete Date Status  
01/28/2019 DEV PKG - REVISION 02/27/2019 COMPLETED Review Details
02/27/2019 DEV PKG - REVISION 04/16/2019 COMPLETED Review Details
09/04/2020 DEV PKG - OK TO SUBMIT 10/06/2020 COMPLETED Review Details
10/03/2017 DEV PKG - OK TO SUBMIT 10/03/2017 COMPLETED Review Details
10/03/2017 DEV PKG 11/02/2017 COMPLETED Review Details
10/06/2020 REVISION - - 2ND 10/15/2020 COMPLETED Review Details
11/20/2017 DEV PKG - RESUBMITTAL 11/22/2017 COMPLETED Review Details
11/22/2017 DEV PKG - RESUBMITTAL 01/30/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP17-0241
Permite Description: SITE/GRADING - Rio Verde Village, Block 2 development, medical office and general office/retail.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/19/2020 ENGR Engineering Final N/A Complete (Recurring) {Activity date: 10/19/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Complete all notes from last inspection before calling for final.} ; {Activity date: 10/15/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE WOR AS SHOWN ON THE APPROVED PLANS, INSTALL HANDRAIL ON THE SAFETY BARRIER AT THE NORTHEAST CONER OF THID BUILDING IN ALL AREAS THAT HAVE A RUNNING SLOPE VALUE GREATER THAN 5%.} ; {Activity date: 10/14/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Courtesy, unscheduled inspection for Ray at 602-332-7661. Please schedule all required inspections from your development package permit prior to Requesting building final inspections.} ; {Activity date: 10/01/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready.Walk site with GC went over approved plans and some changes. Advise GC to install per approved plans or provide COT approved revisions for all changes.}

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0241
Permit Description: SITE/GRADING - Rio Verde Village, Block 2 development, medical office and general office/retail.
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/15/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/15/2020 SITE - Stormwater Follow-up Passed {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.

} ; {Activity date: 09/09/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 08/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 07/08/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 05/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - No concerns at this time} ; {Activity date: 05/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - No concerns at this time.}
10/15/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/15/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/14/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Denied. Ray at 602-332-7661. Please schedule all required inspections from your development package permit prior to Requesting building final inspections.} ; {Activity date: 02/04/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Met on site with grading contractors they did not have city of Tucson approved plans on site}
10/15/2020 COT - ENGR - Signage Final Passed {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/14/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/14/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/15/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL LANDSCAPING AS SHOWN ON THE APPROVED PLANS, OR PROVIDE US WITH AN APPROVED SET OF REVISED DRAWINGS OF ALL CHANGES.}
07/14/2021 SITE - Stormwater Final Inspection Passed {Activity date: 07/14/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Note, inspector recommends approving remaining inspections and changing status to final approved on this expired permit as engineering final was approved by DR

} ; {Activity date: 10/15/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE CLOSEOUT DOCUMENTATION FOR THIS PERMIT,CERT LETTER, N.O.T., AND REVISED APPROVED DRAWINGS.}