Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP17-0146
Parcel: 14043013B

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP17-0146
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/21/2017 AMORALE3 START PLANS SUBMITTED Completed
07/11/2017 MCASTRO2 ZONING HC REVIEW Reqs Change
07/11/2017 MCASTRO2 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Mark Castro, Lead Planner - for Steve Shields, Principal Planner
PDSD Zoning Review Section

PROJECT: Raytheon Building 845 Hanger Addition
Development Package (1st Review)
DP17-0146

TRANSMITTAL DATE: June 22, 2017

DUE DATE: July 19. 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 21, 2018.

2-06.3.0 FORMAT REQUIREMENTS

1. 2-06.3.12 - Provide page numbers corresponding to each sheet and name the sheets as listed in the index (see redline).

CONTENT REQUIREMENTS

2. 2-06.4.2.B - Provide a legal description in the title block on all sheets.

3. 2-06.4.2.D - Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) on all sheets.

4. 2-06.4.3 - Provide the development package case number, DP17-0146, and the annexation case number, C15-09-03, adjacent to the title block on all sheets.

5. 2-06.4.4.A - Show the subject property approximately centered within the one square mile area in the location map.


2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

6. 2-06.4.7.A.2 - In note 2 under Zoning and Land Use Notes, list the gross area of the site by square footage and acreage. The calculation provided seems to be for the new expansion area only.

7. 2-06.4.7.A.4 - In note 4 under Zoning and Land Use Notes, replace "aircraft hangar" with the following: "Transportation Service, Air Carrier subject to UDC Section 4.9.13.Q"

8. 2-06.4.7.A.6 - Add note 5, "Project shall be in conformance with UDC Sec 5.6 Airport Environs Zone (AEZ)". Also, draw and label the AE height zone lines on the cover sheet and site plan.

2-06.4.7.A.8 - For development package documents provide:

9. 2-06.4.7.A.8.c - Under Area Calculations, provide the percentage of building expansion.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

10. 2-06.4.9.F - The site is adjacent to I-1 zoning. Label the zoning on and adjacent to the project and show the zoning boundary adjacent to the I-1 zone.

11. 2-06.4.9.H.3 - Label the fire lane and show the width of the lane on the site plan.

12. 2-06.4.9.H.5.a - On the cover sheet, a parking area is proposed but details have not been provided. If parking is proposed, then show all motor vehicle off-street parking spaces, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

13. 2-06.4.9.O - Provide building setback lines from proposed and existing detention/retention basins.

14. 2-06.4.9.Q - Provide the square footage and height within the footprint of the proposed building.


If you have any questions about this transmittal, contact Mark Castro, (520) 837-4979 or Mark.Castro@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/12/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
07/17/2017 ALEXANDRA HINES OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approv-Cond July 17, 2017

Thank you for the opportunity to comment on DP17-0146, Building 845 Hanger Addition; 1st Submittal, a development package application for an approximately 0.73 acre site located southeast of the end of East Aero Park Boulevard. This project site is specifically located west of an active runway, Runway 11R/29L, on Tucson Airport Authority managed property. The proposed land use is industrial; establishing an aircraft hangar.

The applicant shall file Form 7460 with the FAA at least 45 days before construction activities begin. Any cranes used for the project must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.

Respectfully,

Scott Robidoux,
Senior Airport Planner

cc file
MS
ER
07/18/2017 MARTIN BROWN COT NON-DSD FIRE Approved
07/19/2017 LOREN MAKUS ENGINEERING REVIEW Reqs Change Include the Development Package approval stamp on each sheet.
The drainage statement is accepted for this project.
Include the complete retention basin in the plan sheets.
07/19/2017 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval.
07/20/2017 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans
07/20/2017 ANDREW CONNOR NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/04/2017 FERNE RODRIGUEZ OUT TO CUSTOMER Completed