Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - DP16-0158
Review Name: GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/26/2016 | ANDREW CONNOR | NPPO | REVIEW | Approv-Cond | Ensure that all Zoning and Engineering comments and concerns are addressed. |
09/30/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 8880 E. Old Vail Road Grading Plan (1st Review) DP16-0158 TRANSMITTAL DATE: September 30, 2016 DUE DATE: September 30, 2016 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The grading plan has been reviewed by the Zoning Section but cannot approve the plan until all Engineering, comments, concerns, and appropriate revisions have been addressed. Once approved by Engineering Zoning is willing to provide an over the counter review. Please call or email to schedule this review. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
10/03/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. List DP16-0139 in the list of relevant case numbers on each sheet. 2. This grading plan shows proposed pads not shown on the associated DP16-0139. Provide an explanation in your response letter. The site DP might need to be revised to address this. 3. The plan shows roof drain scuppers discharging into accessible parking spaces and adjacent to access ramps. Move the scupper locations to prevent nuisance ponding in accessible parking and associated ramps. 4. Revise note 11 to include Pima County since PDEQ enforces dust regulations. 5. Revise grading note 26 to provide for a maximum depth of 9 inches in water harvesting areas. 6. Provide a barrier or barrier along the south edge of the vehicle use area to prevent vehicles from driving of the paved surface. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/04/2016 | RBENT2 | OUT TO CUSTOMER | Completed |