Permit Number: DP16-0044
Parcel: 13705494B

Review Status: Completed

Review Details: REVISION - TENT PLAT & CORE RESUB

Permit Number - DP16-0044
Review Name: REVISION - TENT PLAT & CORE RESUB
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/15/2019 SBEASLE1 START PLANS SUBMITTED Completed
05/21/2019 MARTIN BROWN COT NON-DSD FIRE Approved
06/04/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/10/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL
4.1 Identification and Descriptive Data
Ensure that all Zoning and Engineering comments and concerns are addressed.
06/10/2019 SSHIELD1 H/C SITE REVIEW Approved
06/10/2019 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: Irvington & I-19 Commercial Center
Development Package (Revision #7)
DP16-0044

TRANSMITTAL DATE: June 10, 2019

DUE DATE: June 16, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

1. Sheet 10 Lot 11 along the northeast side of the building the numbers calling out the numbers of parking spaces are not correct.

2. Sheet 10 Lot 10 along the southeast side of the building the numbers calling out the numbers of parking spaces are not correct.

3. Sheet 10 Lot 23 it appears that the trash enclosure is being relocated and should be part of this revision.

4. Sheet 10 Lot 23 it appears that pedestrian circulation is cross a stacking area. Per TSM Section 7-01.4.1.G Sidewalks or crosswalks cannot cross any type of stacking areas for drive-through lanes.

5. Sheet 19 Lot 11 Along the northwest side of the building vehicles are allowed to overhang the sidewalk therefore the sidewalk is required to 6'-6" wide to maintain a 4'-0" clear sidewalk.

6. Sheet 79 Building 10 detail show the 2'-6" required dimension from the end of the rack to the column.

7. Remove the development package approve stamp from all revised sheets as an electronic stamp will be applied when approve.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/17/2019 LOREN MAKUS ENGINEERING REVIEW Approved
06/18/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change REVISION PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Fee Balance: $511.50 (see the Balance column in the image below). Prior to the completion of the next review, we require payment of the total fees (or the Review fees at a minimum).
You may pay in person at the City of Tucson permit counter or mail a check payable to the City of Tucson (see address below). Please write your Activity Number on the check stub.
Activity Number: DP16-0044
Project Description: TENTATIVE PLAT/GRADING/SWPPP - Irvington & 1-19 Commercial Center.
To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
After all corrections are made, please name your Revision #7, 2nd submittal documents accordingly, for example: REV-7_2_Plan_Set.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter
2) Plan Set (or sheets)
3) Any other items requested by review staff
After resubmittal, the plans will again enter the standard 20-working-day review cycle.
Thank you.
Sharon Beasley, Permit Technician

City of Tucson
Planning and Development Services
Attn: Permit Counter
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
06/18/2019 SBEASLE1 OUT TO CUSTOMER Completed