Permit Number: DP16-0044
Parcel: 13705494B

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP16-0044
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/05/2016 ARUIZ1 START PLANS SUBMITTED Completed
08/08/2016 PGEHLEN1 PIMA COUNTY WASTEWATER Approved August 5, 2016


To: Jeff Hunt, PE
Cypress Civil Development, Inc



____________________________________
From: Hussein Al Zubaidi, RWRD (520) 724-6404


Subject: IRVINGTON & I10 COMMERCIAL CENTER
P16WS00028
TP- 3rd Submittal




The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer design for the above-referenced project. The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS).




If you have any questions regarding this matter please contact me at your convenience.

Cc. Lorenzo Hernandez, P.E., RWRD
Thomas Porter, P.E., RWRD
Francisco Galindo, P.E., RWRD
08/08/2016 KBROUIL1 COT NON-DSD FIRE Approved
08/09/2016 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP16-0044/Irvington & I-19 Commercial Center/2nd Submittal is Approved by Pima County Addressing.

Thank you,

Robin Freiman
Addressing Specialist
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
08/09/2016 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
240 N STONE AVENUE
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR

TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Julieann Arechederra
GIS Cartographer
Pima County Assessor's Office

DATE: August 8, 2016

RE: Assessor's Review and Comments Regarding:

IRVINGTON & I-19 COMMERCIAL CENTER DP16-0044
(TENTATIVE PLAT 3)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Plat meets Assessor's Office requirements.
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:

" OUR RECORDS SHOW THE CITY OF TUCSON AS OWNERSHIP.
TENTATIVE PLAT SHOWS IIP LLC AS OWNERS.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
08/10/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The revised utility plans show some of the lots that will require backwater valves but twenty-two lots appear to be missing backwater valves. The lots that appear to be missing backwater valves are: 6, 11, 12, 20, 23, 24, 25, 26, 28, 29, 30, 32, 33, 34, 35, 36, 37, 38, 39, 40, 44, and 47. In addition lot 4 seems to have two different first floor elevations: 2431.95' on sheet 59 and 2432.52' on sheet 62. [Previous comment: The revised site utility drawings now show the rim elevations of the proposed and existing manholes along with the proposed first floor elevations. Provide a note on the plans requiring the installation of a backwater valve for those buildings that are less than 12" above the rim elevation of the next upstream manhole. It appears that 30 of the buildings will require a backwater valve. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.]
08/11/2016 AHINES2 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved Trish,



I have reviewed the coversheet for this project. The notes I have requested are present. Please proceed with approving it.



Thank you again for your help!



Thank you,



Scott Robidoux

Airport Planner



cid:image001.png@01D19733.CA48CCF0



7250 South Tucson Boulevard, Suite 300

Tucson, AZ 85756



Office: (520)-573-4811
08/17/2016 AHINES2 ENV SVCS REVIEW Reqs Change The City of Tucson - Environmental Services Department (ES) has completed our review of Project No. DP16-0044, Irvington & I-19 Commercial Center / 2nd Submittal. This project consists of the development of 47 lots and associated buildings. Proposed uses of the buildings include retail, food service, lodging and medical.

On April 27, 2016, ES provided six comments on the tentative plat package for the Irvington & I-19 Commercial Center. The six comments and our response include:

-The double waste enclosure to the west of Building #36 should be changed to two single enclosures. This change has successfully been made on the site plan for Lot / Building #36.
-The double enclosure to the west of Building #14 should be relocated closer to the Parking Area Access Lane. This change has successfully been made on the site plan for Lot / Building #14.
-Demonstrate that the collection vehicle can access the waste enclosure at Building #13 while maintaining a 3 foot clear distance from the parking space. This demonstration has been successfully made.
-Remove the note on Sheet 3 that states that some of the buildings will have internal waste bins that will be rolled out for collection. This note was not removed from Sheet 3. All refuse and recycling materials within the development shall be stored and collected in front load metal containers located within standard enclosures.
-Designate which enclosures on the plans will be used for recycling. Trash containers are noted correctly on the plans with the letter "T" and recycling containers are noted correctly on the plans with the letter "R".
-Add a note stating who is responsible for the management and maintenance of solid waste collection services and storage areas within the development. Based on a review of the 157 plan sheets in this development package, this note was not identified. This note should be added to the development package If not done already.

In summary, the resubmittal of the Irvington & I-19 Commercial Center plans should incorporate the above comments.

Please contact me if there are any questions concerning this review.

Tom Ryan
City of Tucson - Environmental Services Department
08/22/2016 PAUL BAUGHMAN ENGINEERING REVIEW Approved Need Geotech report introduction updated to indicate that the recommendations are for design purposes and not preliminary. Staff has received an updated letter from the Geotech Engineer that allows for full approval for engineering review of this plan.
08/24/2016 STEVE SHIELDS ZONING REVIEW Approved
08/26/2016 JOE LINVILLE LANDSCAPE REVIEW Approved
08/31/2016 AHINES2 ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve these plans
08/31/2016 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Reqs Change Regional Traffic Engineering has two comments on this submittal; add the access control lines to the plan on Irvington Road and clarify any additional property to be needed for future ADOT/RTA improvements to Irvington Road and I-19. Thank you.

Tom Martinez <TMartinez@azdot.gov>