Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP15-0196
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2017 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approv-Cond | Ensure that all Zoning comments are addressed prior to landscape approval signature. |
01/10/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
01/17/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
01/23/2017 | KLEE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
02/03/2017 | GARY WITTWER | COT NON-DSD | TDOT | Approv-Cond | Revised on 2/3/2017 per e-mail from Gary My major concerns are: 1. The SE corner of Broadway and Church. The public is taken out of the ROW and on to private property. If you want to do this you will need to get a Public Access easement. Hold has been place on building CofO. 2. You are not following the City of Tucson Urban Streetscape Design Manual. The main thing here is that the main pedestrian areas are to be concrete - not pavers. 3. I'm O.K. with the planting and irrigation plan |
12/19/2016 | ARUIZ1 | START | PLANS SUBMITTED | Completed | |
12/21/2016 | CLAURIE1 | DESIGN PROFESSIONAL | REVIEW | Reqs Change | Per IID-15-10 Diocese (T15SA00424) Following conditions of approval to be added on the plan cover sheet: 1. Per UDC Section 5.12.6.L.f a ground vibration study. The study will include proposed methods of demolition, the effects those methods have on adjacent historic buildings, and what safeguards are proposed to prevent unintended damage. Historical data from ground vibration studies taken during previous demolitions that were performed in the downtown core using your proposed methods may be supplemental to support the analysis. The study must be approved by the City of Tucson's Design professional prior to issueance of a demolition permit. 2. Any changes to the design subsequent to the approval of the October 7th, 2016 submiital will return for review by the above listed reviewing authorities. 3. This approval applies only to the requested exemptions and does not constitute approval of a building permit. Compliance with all other applicable zoning and building code requirements is required. Changes made to the plan in order to achieve compliance with these other code requirements which affect the exemption request may require another review for compliance with the IID requirements. |
12/28/2016 | SSHIELD1 | HC SITE | REVIEW | Reqs Change | See Zoning comments |
12/28/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: The Marist on Cathedral Square Development Package (4th Review) DP15-0196 TRANSMITTAL DATE: December 28, 2016 DUE DATE: January 19, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 09, 2016. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. 2-06.4.9.H.5.a - As new vehicle parking is proposed provide a detail for both a standard and accessible vehicle parking space. Also provide a wheel stop location dimension on the detail. 2. 2-06.4.9.H.5.a - Per the 2012 IBC Chapter 11 Section 1106.5 at least one of the provide accessible vehicle parking spaces must be van accessible. Demonstrate on the plan that this requirement is met. Also provide a width dimension for the access aisle for the other proposed accessible vehicle parking space provided. 3. 2-06.4.9.H.5.a - Clearly demonstrate on the plan how the requirements of ICC A117.1-2009 Section 502.5 are met. 4. 2-06.4.9.R - Dimension the required landings for the proposed ramp shown on the plan, see ICC A117.1-2009 Section 405.7 If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |