Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP15-0188
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/09/2015 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: DP15-0188 Address: 3700 S. Calle Polar Development Package: Residential Care Services Use TRANSMITTAL DATE: November 12, 2015 DUE DATE: December 3, 2015 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. This plan has been reviewed for compliance with the Development Package Standards listed in section 2-06 of the City of Tucson Administrative Manual. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC requirements are in the Unified Development Code and can be viewed at the same web link as above Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 2, 2016. 2-06.3.0 FORMAT REQUIREMENTS 2-06.3.1 - Each sheet shall measure 24 inches by 36 inches and include a minimum one inch margin on left side and one-half inch margin on all other sides to facilitate efficient record keeping. A larger sheet format may be used with the approval of the Planning and Development Services Department (PDSD). 2-06.3.2 - All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch. This scale is the minimum accepted to assure the plan will be legible during review and when digitized and/or reduced for record-keeping purposes. The same scale shall be used for all sheets within the set. Smaller scales (60:1 or greater) may be used for some or all of the sheets with the prior approval of PDSD when it is determined legibility and the ability to be digitized and/or reduced for archiving will not be affected. 2-06.3.3 - All lettering and text (upper or lower case), and numbering, shall be a minimum of three-thirty-seconds inches in height to assure the plan will be legible during review and when digitized and/or reduced for archiving. ****************************************************************************************** 2-06.3.7 - A small, project-location map shall be provided in the upper right corner of the cover sheet. 01. COMMENT: Remove the Map and Plat info from the location map. ****************************************************************************************** 2-06.4.0 CONTENT REQUIREMENTS 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 02. COMMENT: List all relevant case numbers as noted in the standard above that are applicable to this site. Review PRO for relevant case numbers, (DP15-0026 was voided). ****************************************************************************************** 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage. 03. COMMENT: The overall property is larger than what is presented in the DP site plan and lot size notes. Clarify if the overall parcel is being split. If so has the lot split application been started? The lot split application must be completed and recorded prior to approval of the DP. In addition to the lot split, the site is not designed to stand alone. Therefore the overall project must be drawn and calculations for both sites must be added to the plans. Cross access, parking, pedestrian is required. ****************************************************************************************** 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 04. COMMENT: Clarify what the proposed what Land Use Class is proposed, "Adult Care or Physical Behavioral Health Services". Correct the use specific standard 4.9.7.I.2.a to 4.9.7.J.2.a listed under general note 3 "use note" on sheet 1. Also, a Special Exception process is required if proposing an unlimited number of residents. If a Special Exception is to be processed, contact John Beall or Manny Padilla for scheduling a Pre-app for the Special Exception meeting. The SE application case number is to be listed on all plan sheets in the lower right corner of all plan sheets. SE conditions of approval are to be listed on the cover sheet, along with the case number and date of approval. ****************************************************************************************** 2-06.4.7.A.5 - On residential projects, list the total number of units/lots proposed. 05. COMMENT: List as a general note the number of units proposed under this development. ****************************************************************************************** 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 06. COMMENT: The proposed development with unlimited residents must be approved under the special exception review process. Clarify if Special exception was processed for the development to the south and if so is this proposed project part of the previous SE. It may be necessary to process the overall site through the special exception process as this site does not stand alone. Contact John Beall for further information on how the SE is to be processed for the overall site. ****************************************************************************************** 2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any. 07. COMMENT: As noted in comment 6, a SE is required for an unlimited number of residents. Add the information for the SE as noted by the standard above. ****************************************************************************************** 2-06.4.7.A.6.b - If there is more than one lot within the site, the note should specify which lots are affected by the additional applications or overlay zones. 08. COMMENT: As noted in comment 6, the SE may have to include the south lot development and conditions of the approval may affect the south lot. The DP shall include the south lot and include any conditions of the approval possibly affecting the existing development. Depict if required any conditions of approval such as landscaping, screening etc. or add notes as required. ****************************************************************************************** 2-06.4.7.A.8 - For development package documents provide: 2-06.4.7.A.8.b - Percentage and area in square feet of building and accessory building coverage; 09. COMMENT: Use Specific Standard section 4.9.7.J.7 allows a maximum of 50% lot coverage. List the lot coverage calculation on sheet 1. ****************************************************************************************** 2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and, 10. COMMENT: Include a expansion calculation as noted by the standard above. ****************************************************************************************** 2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. If the project is being phased, calculations must show that, at each phase, requirements are being met. 11. COMMENT: Include the calculations for the overall site as noted by the standard above. ****************************************************************************************** 2-06.4.7.E.1.a - The following notes will be placed on all plans/plats. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 12. COMMENT: The existing development to the south is be drawn on the DP. ****************************************************************************************** 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 13. COMMENT: The overall site boundary that includes the existing development parcel shall be labeled. ****************************************************************************************** 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval. 14. COMMENT: Clarify what portion of the Electric Easement Dkt. 10104 Pg. 1504 is to be released. Indicate if the easement is ground or aerial easement. ****************************************************************************************** 2-06.4.9.E - Proposed land splits or existing lot lines shall be drawn on the plan with dimensions and the identification number and approximate square footage of each lot. (Please be aware that, if land division occurs and the number of lots falls within the definition of subdivision, a subdivision plat is required.) Land splits require a separate permit and review. 15. COMMENT: List the Land Split case number date and of approval as general note. List the land split case number as reference in the lower right corner of all plan sheets. ****************************************************************************************** 2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 16. COMMENT: Revise the parking number symbol in 2 places on sheet 3 to list the correct number of spaces. The parking section annotated with 7 spaces only has 5 spaces and the parking section annotated with 8 spaces has 10 spaces. See redlines. ****************************************************************************************** 2-06.4.9.M - Grading Plan 2-06.4.9.M.1 - A conceptual grading plan is required on projects with significant topographic conditions. The PDSD Engineering Administrator or designee will determine the need for such a plan. 2-06.4.9.M.2 - Concurrent Review. For all projects, grading plans may be included in the development package and will be reviewed concurrently. 17. COMMENT: The grading plan sheet is reviewed concurrently with the DP site plan. The grading plan will be approved as part of the overall DP application. Ensure that any changes necessary to the site are also made to the grading plan sheet. ****************************************************************************************** 2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning. 18. COMMENT: As noted above in previous comment 4, a special exception is required. Provide the information as noted above as required for the special exception. ****************************************************************************************** 2-06.4.9.X - Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-11.0.0, Landscape Plan Requirements. 19. COMMENT: See the Landscaper reviewer comments related to landscape buffers and Screening requirements. There are block symbols printed on title block and notes text of the landscape plan sheets. Correct the block symbols to text or remove them. ****************************************************************************************** If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package site plan and any requested documents. |
| 11/10/2015 | CHRIS POIRIER | PIMA COUNTY | ADDRESSING | Reqs Change | See additional documents in PRO. From: Michelene Nowak Sent: Tuesday, November 10, 2015 2:47 PM To: DSD_CDRC@tucsonaz.gov Subject: re: DP15-0188/Esperanza en Escalante Veterans Housing-1st Review-- request for additional information Please see the attached plans with addressing comments attached as sticky notes for the above project |
| 11/10/2015 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
| 11/12/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 11/17/2015 | DAVID RIVERA | HC SITE | REVIEW | Approved | |
| 11/24/2015 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | November 24, 2015 ACTIVITY NUMBER: DP15-0188 PROJECT NAME: Veteran Housing PROJECT ADDRESS: 3700 E Calle Polar PROJECT REVIEWER: Zelin Canchola TDOT TDOT recommends approval of the development plan. Condition number 10 of the Special Exception requiring construction of the right turn lane should be removed and it will have no negative impact on traffic in this area. If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov |
| 11/24/2015 | BVIESTE1 | COT NON-DSD | TUCSON POLICE DEPARTMENT | Approved | I have no issues with this request. CSO Becky Noel #37968 Tucson Police Dept. 1100 S. Alvernon Tucson, AZ 85711 520-837-7428 |
| 11/30/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the buildings, building sewers connecting to the existing private sewer collection system, site lighting, or electrical service to the buildings). The on-site utilities may be constructed with a separate permit. 2. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole in the private sewer collection system, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Identify the buildings requiring the installation of a backwater valve. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson. |
| 12/02/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Clarify the locations of the walls indicated by keynote 21. Some of the locations indicated appear to block pedestrian routes. 2. Check the prints for the landscape and hardscape sheets. The selected fonts on the printed sheets didn't render correctly. 3. Note that TDOT may require the drainage pipes into the right-of-way to be constructed of reinforced concrete. A Floodplain use permit will be required for the connection to the drainage channel. |
| 12/03/2015 | JOE LINVILLE | NPPO | REVIEW | Approved | |
| 12/03/2015 | JOE LINVILLE | LANDSCAPE | REVIEW | Reqs Change | Revise the plans as requested by Zoning Review. |
| 12/03/2015 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | Plan Tucson on the Future Growth Scenario Map identifies the project site as "Existing Neighborhoods." Existing neighborhoods are primarily developed and largely built-out residential neighborhoods and commercial districts in which minimal new development and redevelopment is expected in the next several decades. The goal is to maintain the character of these neighborhoods, while accommodating some new development and redevelopment and encouraging reinvestment and new services and amenities that contribute further to neighborhood stability. Plan Tucson supports infill and redevelopment projects that reflect sensitivity to site and neighborhood conditions and adhere to relevant site and architectural guidelines. The South Pantano Area Plan (SPAP) encourages the development of a variety of housing types and the compatibly of new development with existing land uses. The SPAP residential sub-goal directs new development to encourage the development of a variety of housing types including single-family detached units, duplexes, apartments, condominiums, townhouses, and mobile homes. This development should preserve the integrity of established neighborhoods, promote infill of vacant land where adequate streets and utilities are available, and ensure the compatibility of new residential development with existing land uses. Project in compliance with Plan Tucson and the South Pantano Area Plan. On November 2, 2015 a minor change to the Preliminary Development Plan, for SE-03-08 Esperanza En Escalante - Calle Polar, was approved. This minor change was to remove the condition requiring a southbound deceleration lane along Calle Polar. |
| 12/07/2015 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Needs Review | Development Package will not be approved by the City until RWRD has approved the plans |
| 12/07/2015 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) A disk containing all items submitted 3) All items requested by review staff 4) All items needed to approve this plan |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/15/2016 | EGALLET1 | OUT TO CUSTOMER | Completed |