Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP14-0191
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/19/2015 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
05/19/2015 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
05/19/2015 | STEVE SHIELDS | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Surf Thru Car Wash - 51 S. Pantano Road Development Package. Concurrent Review with Rezoning (4th Review) DP14-0191 & C9-04-12 TRANSMITTAL DATE: May 19, 2015 The Zoning Review Section conditionally approves the development package for this project subject to the following: All proposed easements, access agreements must be recorded and the recordation information provided to PDSD prior to issuing the building certificate of occupancy. A hold has been placed on permit T15CM01103. A revised development package (DP) is required for the site north of this project due to the changes proposed in access and parking. The DP must be submitted and approved prior to issuing the building certificate of occupancy for permit T15CM01103. 2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval. 1) COMMENT: As a new access lane is proposed straddling the south property line some type of recorded access agreement or easement is required. Provide the recordation information on the plan. 2) COMMENT: As a new access lane is proposed near the northeast corner of the site some type of recorded access agreement or easement is required. Provide the recordation information on the plan. 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 3) As additional parking has been added southeast of the existing Circle K some type of access easement/agreement is required. 4) As additional parking has been added southeast of the existing Circle K and is for the strip center to the north a revised development plan is required for the site to the north. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov . |
05/19/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/20/2015 | HEATHER THRALL | SIGNS | SIGN CODE REVIEW | Passed | Per rezoning, rezoning conditions related to signs will be verified when sign permis are requested. |
05/20/2015 | PGEHLEN1 | COT NON-DSD | TRAFFIC | Approved | Per signature on the plans |
05/26/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approv-Cond | The current submittal did not provide adequate information in order to verify compliance with the outdoor lighting code and for the even distribution of illumination. Therefore, the review for compliance with the outdoor lighting code and the even distribution of illumination will be conducted during the review of the construction documents. |
05/27/2015 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/27/2015 | PGEHLEN1 | APPROVAL SHELF | Completed |
05/27/2015 | PGEHLEN1 | OUT TO CUSTOMER | Completed |
05/27/2015 | PGEHLEN1 | REJECT SHELF | Completed |