Permit Number: DP14-0143
Parcel: 13321074B

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP14-0143
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/16/2014 PGEHLEN1 START PLANS SUBMITTED Completed
12/16/2014 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approved
12/16/2014 STEVE SHIELDS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Wilmot Plaza
Development Package (3rd Review)
DP14-0143

TRANSMITTAL DATE: November 6, 2014

DUE DATE: November 20, 2014

The Zoning Review Section conditionally approves the development package for this project subject to the following conditions. However, should there be any changes requested by other CDRC members, the Zoning Review Section conditional approval is void, and we request copies of the revised development package to verify that those changes do not affect any zoning requirements.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

1. COMMENT: A hold has been put on the certificate of occupancy for building permit T14CM07545 until the recordation information for the following easements has been provided on the development package. The "10' ELECTRICAL EASEMENT TO BE ABANDONED" that runs under Building 6 and the "EXISTING COMMUMICATIONS EASEMENT" that runs under Building 1, will need to be abandoned prior to approval of the development package. Provide the recordation information on the plan.


If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov
.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/06/2015 CPIERCE1 OUT TO CUSTOMER Completed