Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP13-0230
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/23/2014 | AROMERO4 | START | PLANS SUBMITTED | Completed | |
05/30/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
06/11/2014 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
06/12/2014 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
06/25/2014 | PGEHLEN1 | COT NON-DSD | ENVIRONMENTAL SERVICES | Reqs Change | The resubmittal has been reviewed on behalf of Environmental Services and is denied. Please address the following comments on the resubmittal: 1. The proposed solid waste enclosure doesn’t meet the design requirements of the technical standards manual figure 8-01.9.3A. A TSMR is will be required for approval of the design differences. 2. Detail 9 on Sheet 4 is lacking many of the basic requirements of the enclosures. Although angled use of the enclosures is possible through the TSMR process, the enclosure must still provide the dimensions and construction details as shown in the Figures in TSM Section 8, including the clear areas in front of the enclosures are to be 14’ x 40’ for each enclosure. Please revise detail 9 on Sheet 4 to reflect this clear area. 3. Revise Detail 9 to show the required 12ft. clear gate openings for each container per TS 8-01.5.2.F 4. Revised Detail 9 to show the reinforcement in the slab, the walls of the enclosure, the missing bollards, the required inside clear dimensions, the gates and gate supports, etc. as required in the figures in TSM Section 8. 5. Show the grades and slopes associated with the enclosures to demonstrate compliance with TSM 8-01.5.2.G and with Figure 3A. Because the deficiencies are numerous, I suggest the applicant and I meet prior to the next submittal to discuss these comments. I can be reached at kperry@perryengineering.net. |
06/25/2014 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Needs Review | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled copies of the plans 2) A disk containing all items submitted. 3) All items requested by review staff 4) All items needed to approve this plan |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/22/2014 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |