Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9675 E BROADWAY BL
Apply Date:
11/19/2013
Applicant:
Description:
A FAMILY SELF STORAGEOriginally approved 7/29/2014 (12 pages).1st Revision approved

Permit Reviews

Permit Number - DP13-0230
Permit Status: Complete
Permit Description: A FAMILY SELF STORAGEOriginally approved 7/29/2014 (12 pages).1st Revision approved
Start Date Submittal Complete Date Status  
04/04/2014 DEV PKG - RESUBMITTAL 05/05/2014 COMPLETED Review Details
05/23/2014 DEV PKG - RESUBMITTAL 07/22/2014 COMPLETED Review Details
07/22/2014 DEV PKG - RESUBMITTAL 07/31/2014 COMPLETED Review Details
08/30/2016 REVISION - SITE 08/30/2016 COMPLETED Review Details
08/30/2016 REVISION - SITE 09/16/2016 COMPLETED Review Details
11/19/2013 DEV PKG - OK TO SUBMIT 11/20/2013 COMPLETED Review Details
11/21/2013 DEV PKG 12/27/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0230
Permit Description: A FAMILY SELF STORAGEOriginally approved 7/29/2014 (12 pages).1st Revision approved
Total Completed Inspections - 7
Date Description Inspector Results Comments
12/01/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/01/2016 SITE - Stormwater Follow-up Passed {Activity date: 12/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/29/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REPAIRS NEEDED ON SOUTH WEST SIDE OF SITE.} ; {Activity date: 02/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/15/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/24/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME .} ; {Activity date: 10/13/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/31/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC REP TO MAKE REPAIRS TO NORTH SIDE OF SITE TO SWPPP CONTROLS.} ; {Activity date: 08/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT REPAIRING SWPPP CONTROLS.} ; {Activity date: 07/15/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/10/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - CALLED GC ABOUT SWPPP REPAIRS.}
12/01/2016 ENGR Grading Final Passed {Activity date: 12/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/15/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY AT THIS TIME.}
12/01/2016 SITE - Stormwater Final Inspection Passed {Activity date: 12/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/01/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 12/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/09/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE WASH OUT .}
12/01/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/03/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PRE-CON WITH GRADING CONTRACTOR AND GC.}
02/15/2017 ENGR Engineering Final Passed {Activity date: 02/15/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/01/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. PROVIDE COT AP AS-BUILTS FOR ALL CHANGES TO AP PLANS.}