Permit Number: DP13-0199
Parcel: 117042630

Address:
222 E 5TH ST

Review Status: Completed

Review Details: RESUB - SITE and/or GRADING

Permit Number - DP13-0199
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2014 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond Ensure that all Zoning and Engineering comments and concerns are addressed prior to Landscape approval signature on all documents.
12/19/2013 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Michael St Paul
Planning Technician

PROJECT: DP13-0199
222 East 5th Street
Administrative Office

TRANSMITTAL DATE: October 22, 2013


DUE DATE: November 7, 2013

2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

COMMENT: Identify and depict all existing easements, as required, on the site plan/

2-06.4.9.H.5.b - If any of the required parking is located off-site as permitted by the UDC, a drawing of that parking area is to be provided, together with the city's required parking agreement (include a copy of the lease agreement if applicable) must be provided. Please remember that in these situations, if the off-site parking location is a new parking area, it must comply with all parking area requirements and must be allowed as a principal use by the zoning classification of that property. If the off-site parking area location is an existing parking lot, the parking spaces utilized for the proposed land use must be non-required parking for the existing use for which the parking area was established.

COMMENT: The reference for a parking easement (DK 13108 Pg 952) provides none of the required information for the off-site parking. Provide approved site plans for the off-site parking and provide all the information identified above. Submit the parking plan to Glenn Moyer.

2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

COMMENT: Provide a detail with all the required information (UDC Sec 7.4.9.D) on the site plan. Demonstrate compliance with all the long-term bicycle parking requirements on the site plan (UDC Section 7.4.9.D 1 Location, .2 Security, and .4 Signage).

2-06.4.9.X - Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-11.0.0, Landscape Plan Requirements.

COMMENT: See comments by landscaping review.

If you have any questions about this transmittal, please call Michael St Paul, (520) 837-4959.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package site plan and any requested documents.

Submit the vehicle use area parking plan to Glenn Moyer.

Provide the long-term bicycle parking plan and detail.
12/20/2013 RONALD BROWN HC SITE REVIEW Reqs Change Provide access to the courtyard from the accessible parking spaces as required by the 2012 IBC, Section 1104.
12/26/2013 JASON GREEN ENGINEERING REVIEW Approv-Cond DATE: December 26, 2013
SUBJECT: Mister Carwash Development Plan Package- 2nd Engineering Review
TO: Metro TED; Attn: Lisa Bowers
LOCATION: 222 E 5th St; T14S R13E Sec22
REVIEWERS: Jason Green, CFM
ACTIVITY: DP13-0199


SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package and Drainage Statement (Cypress Civil Development, 04OCT13). Engineering Division recommends conditional approval of the Development Plan Package at this time.

The following items need to be addressed prior to final DP Package approval:

SITE PLAN:

1) AM Sec.2-06.4.9.H.1: It is acknowledged that TDOT has approved the current configuration for the proposed driveway entrances however any proposed changes as stated by the applicant will require a new review and approval from TDOT Permits and Codes.

2) AM Sec.2-06.4.9.L: It is acknowledged that the electrical easement will be created upon final approval from TEP; however documentation is still required from the Recorders office with SEQ# to verify that indeed these easements have been created prior to final CofO for the building.

GENERAL COMMENTS:

For any questions or to schedule meetings call me at 837-4929.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
12/30/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/22/2014 SHANAE POWELL OUT TO CUSTOMER Completed
01/22/2014 CPIERCE1 REJECT SHELF Completed