Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: D04-0024
Parcel: 13819045B

Address:
212 W MEDINA RD

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D04-0024
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/13/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/28/2007 KAROL ARAGONEZ ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D04-0024
San Miguel High School
Development Plan Revision Resubmittal

TRANSMITTAL DATE: April 18, 2007

DUE DATE: April 18, 2007

COMMENTS:

The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.


If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 74960.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D04-0024dpr1.doc
04/05/2007 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D04-0024 SAN MIGUEL HIGH SCHOOL/REVISED DEVELOPMENT PLAN
DATE: April 5, 2007



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

NOTE:

Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses.

2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection.




jg
04/11/2007 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond April 10, 2007

TO: Mark P. McCarty, P.E.
McCarty Engineering, Inc.

THRU: Patricia Gehlen, CDRC Manager
City of Tucson, Development Services Department

FROM: Chandubhai C. Patel, P.E., Civil Engg. Manager
Development Review Division (Wastewater)
Pima County Development Services Department

SUBJECT: San Miguel Catholic High School, Phase III Building “C” & “D”
Development Plan – 2nd. Submittal
D04-024


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


ALL SHEETS: Show the name of the project, “San Miguel Catholic High School”, bolder and larger.

SUBJECT TO THE ABOVE, the Pima County Department of Environmental Quality and Wastewater Management Department hereby conditionally approve the above referenced submittal of the development plan received by us on March 9, 2007. The revision may be shown on the Mylars.

Please note the following: the conditional approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) may need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality active permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution.


If you have any questions regarding the above comments, please do not hesitate to contact me.

Sincerely,







Chandubhai C. Patel, P.E.
Telephone: (520) 740-6563

Copy: Project file
04/20/2007 JASON GREEN ENGINEERING REVIEW Approved DATE: April 20, 2007
SUBJECT: San Miguel High School 3rd Phase- 2nd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 212 W Medina Rd, T15S R13E Section 13, Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: D04-0024


SUMMARY: Engineering Division of Development Services Department has received the proposed development plan, landscape plan, drainage report and Drainage Letter Statement. Engineering Division has reviewed the submitted development plan and recommends approval of the development plan at this time.



For any questions, or to schedule a meeting call me at 837-4929.




Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
04/23/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 23, 2007

Mark P. McCarty
McCarty Engineering, Inc.
320 W. Alturas Street
Tucson, Arizona 85705

Subject: D04-0024 San Miguel School Revised Development Plan

Dear Mark:

The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per on-line, please submit the following documents for sign-off.

1 Double Matte right-reading Océ or Photo Mylar of the COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal).
AND
1 Double Matte right-reading Océ or Photo Mylar of the Development Plan.

The extra Double Matte right-reading Océ or Photo Mylar that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete mylar set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and two (2) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

TO ENSURE A MORE RAPID REVIEW OF THE MYLARS, PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.ci.tucson.az.us/dsd/CDRC Rezoning/CDRC/CDRC Stamp/cdrc stamp.html.

Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 579-3686