Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13819045B
Parcel Search
Parcel Attributes
| Parcel | 13819045B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/09/2025 6:16 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 12/09/2025 6:16 a.m.
Total Number Of Rezone Cases - (2)
Permits
Parcel Number - 13819045B
Date - 12/09/2025 6:16 a.m.
Total Number Of Permits - (101)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0225-00276 | Inspections | 02/11/2025 | 04/21/2026 | Commercial Building | Site Electrical | |
| TD-DEV-0225-00052 | Complete | 02/11/2025 | 11/06/2028 | Development Package | Restricted Record - New landscape for existing San Miguel campus (site electrical by separate permit) / Site and Grading | |
| TC-COM-0525-01030 | Inspections | 05/21/2025 | 05/11/2026 | Commercial Building | New canopy - no electrical | |
| D04-0024 | Expired | 06/15/2004 | 12/22/2006 | Development Package | Expired- SAN MIGUEL HIGH SCHOOL | |
| TC-COM-0725-01368 | Inspections complete | 07/15/2025 | 03/03/2026 | Commercial Building | INSTALL 3 NEW SHADE STRUCTURES AS SHOWN IN DEVELOPMENT PLAN TD-DEV-00225-00052 | |
| TR-ROW-0724-00839 | Complete | 07/23/2024 | 08/24/2024 | Right-of-Way (ROW) | Violation of Tucson City Code Chapter 25 Section 25-12 Damaged Sidewalk Requiring Repair | |
| DS05-21 | Approved | 07/26/2005 | N/A | Zoning Compliance | 6601 S SAN FERNANDO RD - DSMR 05-21 SAN MIGUEL HIGH SCHOOL | |
| T22FO00826 | Complete | 09/27/2022 | 09/29/2023 | Fire Operational Permit | Places of Assembly - OCC 1,219; Other Operational Permit | |
| TF-FOP-1123-01742 | Complete | 11/07/2023 | 09/27/2024 | Fire Operational Permit | PLACES OF ASSEMBLY GYM | |
| TR-ROW-1123-01382 | Void | 11/24/2023 | N/A | Right-of-Way (ROW) | Procession on 12/11/23 Meeting at Lerdo and San Fernando. Right on San Fernando, right on Missiondale, right on Aradon, right on San Fernando into Santa Monica Church parking lot. | |
| D06-0057 | Canceled | 12/20/2006 | 02/26/2009 | Development Package | not sure | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| C10-04-18 | Efectuat | 12/18/2008 | N/A | LUCAPHST | C10-04-18 SAN MIGUEL HIGH SCHOOL AND ST. MONICA CHURCH/ROMAN CATHOLIC DIOCESE OF TUCSON (D04-0024) The project site is an approximate nine acre property developed with an existing religious use. The applicant proposes to expand the site's development by the construction of a new high school. The project has been reviewed and approved as a Special Exception land use in the R-1 zone. The project's overall site design as desired by the applicant and as agreed to in the Special Exception process, however, requires that certain variances to the Land Use Code (LUC) be obtained. The applicant is requesting the following variances: 1) Increase the maximum building height of the multipurpose/gymnasium from twenty-five (25') feet to thirty (30') feet; 2) Increase the maximum lot coverage from fifteen (15%) percent to forty-seven (47%) percent; 3) Increase the maximum Floor Area Ratio (FAR) from ten (10%) to nineteen (19%) percent; 4) Substitute a thirty (30") inch to forty-two (42") high combination landscape screen and wall, in lieu of a five (5') high landscape screen around the parking lot; with a maximum height of thirty (30") inches for that portion of the screen located within the site visibility triangle, as shown on the submitted landscape plan; 5) Allow a portion of the street landscape border to be located behind the screen wall as shown on the submitted plan; 6) Substitute a decorative steel security fence, in excess of six (6') feet in height, to be located along the entire eastern boundary, in lieu of a five (5') high wall along the eastern boundary; 7) Allow a third passenger drop-off and all maneuvering into and out of the spaces to occur within the right-of-way of Lerdo Road, on the north end of the school, as shown on the submitted site plan; 8) Allow vehicular maneuvering from bus storage areas and loading spaces directly into the right-of-way, as shown on the submitted plan; and, 9) Allow those development criteria required for the project be provided, as indicated on the project's submitted site plan. DECISION: Variances 1, 2, 3, 4, 5, 6, 7, 8 and 9: Granted as Requested | |
| T05BU00889 | Final | 04/15/2005 | 01/04/2006 | 01 | BUILD | ADD: FIRE ALARM SYSTEM |
| T05BU02403 | Final | 09/28/2005 | 08/07/2006 | 02 | SPKLR | FIRE SPKR:NEW 112 |
| T05BU03017 | Withdrwn | 12/27/2005 | N/A | 02 | SPKLR | ADDITION TO EXISTING FIRE ALARM |
| T05BU03018 | Final | 12/27/2005 | 08/07/2006 | 02 | BUILD | ADDITION TO EXISTING FIRE ALARM SYSTEM |
| T05CM01898 | C of o | 04/29/2005 | 03/20/2007 | 02 | COMBO | CLASSROOM BUILDING:NEW |
| T05EX00980 | Closed | 09/02/2005 | 11/01/2005 | EXCAV | EXCA:INSTALL SIDEWALK ALONG SAN FERNANDO | |
| T05OT01619 | Final | 06/29/2005 | 01/08/2006 | SIGN | SIGN: 9274 SAN MIGUEL HIGH SCHOOL | |
| T06EL02026 | Withdrwn | 10/06/2006 | N/A | ELECT | ELECTRICAL FOR INSTALLION OF SIGN LIGHTING. SIGNS ARE NOT OF THE ILLUMINATED SORT. | |
| T06OT02622 | Final | 10/09/2006 | 09/24/2007 | SIGN | 11963 | |
| T07BU01148 | Final | 05/21/2007 | 01/17/2009 | GRADING | CUT 600CY FILL 300CY | |
| T07BU01591 | Final | 07/25/2007 | 10/22/2008 | SPKLR | Install 231' new 4" fire service underground | |
| T07BU02205 | Expired | 10/17/2007 | 04/14/2008 | TENTS | TENT:CANOPY | |
| T07BU02234 | Final | 10/22/2007 | 12/13/2008 | 03 | SPKLR | Add 52 fire sprinklers |
| T07BU02235 | Final | 10/22/2007 | 10/29/2008 | 05 | SPKLR | Add 164 fire sprinklers |
| T07CM00242 | C of o | 01/19/2007 | 01/19/2009 | 03 | COMBO | NEW CLASSRM; STEEL JOIST REVIEW |
| T07CM00243 | C of o | 01/19/2007 | 01/17/2009 | COMBO | NEW MULTIPURPOSE BLDG | |
| T07CM00957 | Si_xpire | 03/08/2007 | 01/26/2008 | 02 | COMBO | TI:CLASSROOM |
| T07CM02162 | Final | 05/24/2007 | 01/21/2008 | COMBO | ELECT ONLY FOR COMPUTERS | |
| T07CM02344 | Final | 06/07/2007 | 12/18/2007 | COMBO | TEMP CONSTRUCTION TRAILER W/ELECTRIC | |
| T07CM04842 | Final | 12/27/2007 | 10/07/2008 | 06 | COMBO | ADDT: 2 BASKETBALL COURTS COVERED SEATING STRUCTURES |
| T08BU00268 | Withdrwn | 02/11/2008 | N/A | BUILD | ADDITION:STORAGE SHED | |
| T08BU00285 | Final | 02/13/2008 | 10/26/2008 | BUILD | HOOD SYSTEM | |
| T08BU00679 | Final | 04/08/2008 | 12/13/2008 | BUILD | NEW ADDITION TO EXSISTING FIRE ALARM SYSTEM | |
| T08BU01127 | Final | 06/18/2008 | 12/29/2008 | 01 | SPKLR | Add 1, relocate 11 fire sprinklers |
| T08CM00689 | C of o | 02/28/2008 | 01/10/2009 | 01 | COMBO | TI: ADMIN/CLASSROOM |
| T08EX00323 | Closed | 04/16/2008 | 06/15/2008 | EXCAV | INSTALL SEVEN 2' x 5' AREA OF TRUNCATED DOMES | |
| T08OT00078 | Final | 01/11/2008 | 02/17/2009 | SIGN | 14302 | |
| T12BU01502 | Final | 12/19/2012 | 09/23/2013 | 07* | BUILD | Install new fire alarm system |
| T12CM00887 | Final | 03/06/2012 | 10/02/2012 | COMBO | CHANGE FROM SEPIC TO SEWER:RECTORY | |
| T12CM05572 | Expired | 09/06/2012 | 12/24/2013 | 01 | COMBO | TI: ADDS AND ALTS FOR ST. MONICA CHURCH |
| T13BU00025 | Final | 01/09/2013 | 08/21/2013 | SPKLR | Install 70'-0" of 4" underground fire service | |
| T13BU00026 | Void | 01/09/2013 | 07/08/2013 | BUILD | FIRE SPRINKLER UNDERGROUND PRESSURE TEST AND UNDERGROUND FLUSH | |
| T13BU00058 | Closed | 01/16/2013 | 04/05/2023 | SPKLR | Install 159 fire sprinklers | |
| T13BU00350 | Final | 03/26/2013 | 09/23/2013 | SPKLR | SPRINKLER | |
| T13CM00612 | Final | 02/01/2013 | 10/09/2013 | 01 | COMBO | INSTALLATION OF ROOF MOUNTED SOLAR PV |
| T13EX00066 | Closed | 01/17/2013 | 03/18/2013 | EXCAV | TRENCH 30' OF ASPHALT CROSSING MEDINA RD EAST OF MARTIN LANE, TRENCH 7' OF CURB AND SIDEWALK AND 8' OF DIRT IN FRONT OF ADDRESS TO INSTALL 4' FIRE SERVICE. (APA) | |
| T14CM04535 | Expired | 07/18/2014 | 01/21/2015 | 01 | COMBO | TI: PRIVATE HIGH SCHOOL |
| T14CM06484 | Final | 10/01/2014 | 04/13/2015 | 02 | COMBO | ADD CARPORT TO |
| T16BU01212 | Final | 08/24/2016 | 05/22/2017 | 02 | BUILD | FIRE ALARM IN KITCHEN OF SCHOOL |
| T16CM03834 | L of c | 05/23/2016 | 05/29/2017 | COMBO | TI: KITCHEN REMODEL; COMM | |
| T16FC00032 | Final | 09/07/2016 | 05/16/2017 | FIRECONS | INSTALL NEW HOOD FIRE SYSTEM | |
| T16RW02155 | Final | 10/22/2016 | 12/24/2016 | ROW | STARTING NORTH ON SAN FERNANDO DR 1156' AERIAL OVERLASH S CORNER OF LERDO RD RISER DOWN AND PULLING THROUGH EXISTING CONDUIT, 35' TO ROW WORK ORDER # 41520160000CTU0435 | |
| T19CM01854 | Expired | 03/14/2019 | 01/28/2020 | 01 | COMBO | TI: CHANGE TO CHAPEL |
| T20FO00465 | Final | 09/21/2020 | 10/16/2021 | FIREOPER | 3 tents temporary classrooms set up date 10.01.20 | |
| T21FO00492 | Final | 08/05/2021 | 08/10/2022 | FIREOPER | 2 TENTS 30' X 60' SETUP 7/31/21 SAN MIGUEL HIGH SCHOOL TEMPORARY CLASSROOMS. |
Code Enforcement
Parcel Number - 13819045B
Date - 12/09/2025 6:16 a.m.
Total Number Of Code Cases - 4
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T11FR00844 | Field | 04/15/2011 | N/A | FIREINSP | Private school inspection | |
| T17DV03108 | Complian | 07/19/2017 | N/A | DNR_VIOL | TRASH THROUGHOUT PROPERTY | |
| T18DV06671 | Complian | 10/15/2018 | N/A | DNR_VIOL | TALL GRASS AND WEED | |
| T18DV06672 | Complian | 10/15/2018 | N/A | DNR_VIOL | TALL GRASS AND WEEDS, TREES INTO ALLEY |
Plans
Parcel Number - 13819045B
Date - 12/09/2025 6:16 a.m.
Total Number Of Plans - 3
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T05BA00628 | Approved | 12/21/2005 | N/A | Basin | ||
| T06BA00170 | Approved | 10/31/2006 | N/A | Basin | ||
| TW-CWH-1125-00002 | Active | 11/18/2025 | N/A | Water Conservation and Harvesting | Restricted Record - New landscape for existing San Miguel campus (site electrical by separate permit) / Site and Grading CRWH PLAN ADDED TO MAP TUCSON |