Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D04-0007
Review Name: REVISION - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/12/2005 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed | |
| 04/25/2005 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
| 04/26/2005 | MATT FLICK | ENGINEERING | REVIEW | Denied | DSD Engineering recommends a denial of the minor revision to the approved development plan and offers the following comment: The new impervious area is about twice as large as estimated by the engineer (it appears the new one-way drive may have been excluded). This site lies within a critical basin wherein the proposed 2-, 10- & 100-year discharges are to be at least 10% lower than existing. Given the small differences in flow, it is probable that the flow differences can be mitigated by directing some impervious area to a new landscaped water harvesting area. Resubmittal Required: Drainage Statement Development Plan Landscape Plan Matt Flick Engineering Manager 26APR05 |
| 04/26/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 04/27/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed |