Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Record Request Details
Status:
Complete
Type:
Requests
Request Date:
10/28/2025
Requestor:
Shane
Description:
EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN,
NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE
TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED
TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL
PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2).
THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE
OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE
EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE
AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL
APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO
UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL
STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH
COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT
CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING
COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED
(WOOD FRAMED PARAPETS AND STUCCO FINISH).