Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Record Request Details
Status:
Denied
Type:
Requests
Request Date:
10/15/2024
Requestor:
John
Description:
This Project is not completed all conditions need to be satisfied and documentation needs to be provided. If on expansion anchors and the welding conditions either were not used submit a letter from the engineer to this effect, seal/sign/dated and submit it. Please re-request once all conditions have been satisfied and review is complete.
THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN.
A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE