Record Request Details
Status:
Complete
Type:
Requests
Request Date:
03/07/2024
Requestor:
Tony
Description:
Please extend through 5/31/2024 (60 days)
Full road closure- Continuation of TR-ROW-0823-01028 which expired 01-07-2024 (with renewal) Overnight concrete pours
01-16-2024: TNE for January 23rd with January 22nd and 24th as backup dates AND January 30th with January 29th and 31st as backup dates if needed, starting at 1am and continuing until Sunrise on the following day.
notes from previous permit TR-ROW-0823-01028:
**** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be
testing and cameraing the (3) new manholes that were
installed this summer with Pima County.
Duration of the work will be the following days:
9/25/23 from 5AM to 3PM
9/29/23 from 5AM to 3PM
10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day
12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise
12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise.
01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on
the following day.