Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER DESIGN PLAN REVIEW v.1
Plan Number - TW-WCP-1223-00125
Review Name: WATER DESIGN PLAN REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TFD Review & Signature | PENDING ASSIGNMENT | ||||
TW Design Plan Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | Your submittal is incomplete. Item 6 of the Checklist: Improvement and landscape plans are missing from the submittal. Item 7 of the Checklist: Underground electric Layout missing from the submittal. Master Plan redline comments were not addressed on the Design plan: Tucson Water-New Development Format Standard Title Block was not used. Coversheet does not meet the drafting standards. Offsite Design for the existing 10-inch main replacement as per master plan comments was missing from plan. Control information that ties the control lines on the project to existing monumentation is missing from the plan. Vertical Scale is incorrect for all profiles (1"=2' is required for 20 scale hz). Rolling tees are not permitted. 2-inch valves for services are not permitted. Design and drafting standards are not being met throughout the design. Tucson Water requests a meeting to discuss prior to the first official design submittal. |