Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER CONSTRUCTION PLAN REVIEW v.1
Plan Number - TW-WCP-0624-00040
Review Name: WATER CONSTRUCTION PLAN REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TFD Review & Signature Fast | PENDING ASSIGNMENT | ||||
| TW Design Plan Review | PENDING ASSIGNMENT | ||||
| TW Hydraulic Modeling Review | PENDING ASSIGNMENT | ||||
| TW Issue Invoice | PENDING ASSIGNMENT | ||||
| TW Managerial Review | PENDING ASSIGNMENT | ||||
| TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
| TW Administrative Completeness | REQUIRES RESUBMIT | Design Plans do not meet the requirements of the Design Standards Illustrations 2023 (DSI). A resubmittal of the plans drafted in the correct format is required. Please review DSI: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf Items missing per First Submittal Checklist: 3. Unrecorded easement descriptions with current title report is missing from submittal. 4. Itemized "Cost Estimate" using Tucson Water's Cost Estimate & Material Take-off form missing from the submittal. 5. Recorded Legal Description Reflecting Current Property Limits missing from submittal. 6. Improvement plans, Site Development and Landscape Plans missing from submittal 7. Underground Electric Layout missing from the submittal Please review Tucson Water's Website for Submittal requirements. https://www.tucsonaz.gov/Departments/Water/Contractors-Developers-and-Engineers |
|||
| TFD MWP Initial Review Fast | REVIEW COMPLETED |