Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TW-WCP-0624-00040
Parcel: 13335002P

Review Status: Requires Resubmit

Review Details: WATER CONSTRUCTION PLAN REVIEW v.1

Plan Number - TW-WCP-0624-00040
Review Name: WATER CONSTRUCTION PLAN REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
TFD Review & Signature Fast PENDING ASSIGNMENT
TW Design Plan Review PENDING ASSIGNMENT
TW Hydraulic Modeling Review PENDING ASSIGNMENT
TW Issue Invoice PENDING ASSIGNMENT
TW Managerial Review PENDING ASSIGNMENT
TW Verify Fees Paid PENDING ASSIGNMENT
TW Administrative Completeness REQUIRES RESUBMIT Design Plans do not meet the requirements of the Design Standards Illustrations 2023 (DSI). A resubmittal of the plans drafted in the correct format is required. Please review DSI:

https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf

Items missing per First Submittal Checklist:
3. Unrecorded easement descriptions with current title report is missing from submittal.
4. Itemized "Cost Estimate" using Tucson Water's Cost Estimate & Material Take-off form missing from the submittal.
5. Recorded Legal Description Reflecting Current Property Limits missing from submittal.
6. Improvement plans, Site Development and Landscape Plans missing from submittal
7. Underground Electric Layout missing from the submittal

Please review Tucson Water's Website for Submittal requirements.

https://www.tucsonaz.gov/Departments/Water/Contractors-Developers-and-Engineers
TFD MWP Initial Review Fast REVIEW COMPLETED