Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER CONSTRUCTION PLAN REVIEW v.3
Plan Number - TW-WCP-0624-00040
Review Name: WATER CONSTRUCTION PLAN REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TFD Review & Signature Fast | PENDING ASSIGNMENT | ||||
| TW Design Plan Review | PENDING ASSIGNMENT | ||||
| TW Hydraulic Modeling Review | PENDING ASSIGNMENT | ||||
| TW Issue Invoice | PENDING ASSIGNMENT | ||||
| TW Managerial Review | PENDING ASSIGNMENT | ||||
| TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
| TW Administrative Completeness | REQUIRES RESUBMIT | Your submittal is incomplete please review the following items: - Fire Flow and Duration is missing on the Master Plan. Please include General Construction Notes 1 -12 on the cover sheet of the Master Plan. - Design Plan does not conform to the requirements of the Design Standards Illustrations 2023 (DSI) Please follow the minimum drafting standards for the DSI found here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf Incorrect Cost Estimate and Material Take-off sheet was used. |
|||
| TFD MWP Initial Review Fast | REVIEW COMPLETED |