Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER CONSTRUCTION PLAN REVIEW v.4
Plan Number - TW-WCP-0624-00040
Review Name: WATER CONSTRUCTION PLAN REVIEW v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TFD Review & Signature Fast | PENDING ASSIGNMENT | ||||
| TW Design Plan Review | PENDING ASSIGNMENT | ||||
| TW Hydraulic Modeling Review | PENDING ASSIGNMENT | ||||
| TW Issue Invoice | PENDING ASSIGNMENT | ||||
| TW Managerial Review | PENDING ASSIGNMENT | ||||
| TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
| TW Administrative Completeness | REQUIRES RESUBMIT | Design Plan does not conform to the requirements of the Design Standards Illustrations 2023 (DSI) Please follow the minimum drafting standards for the DSI found here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf Plan and Profile is required for all water construction plans. Profiles for water mains are not optional. Please note that Fire services, water services, and hydrant laterals do not require a profile. This is the third request for conformance to the DSI. |
|||
| TFD MWP Initial Review Fast | REVIEW COMPLETED |