Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER DESIGN PLAN REVIEW v.2
Plan Number - TW-WCP-0524-00039
Review Name: WATER DESIGN PLAN REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TFD Review & Signature | PENDING ASSIGNMENT | ||||
TW Design Plan Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | All water construction plans submitted to New Area Development as of March 1, 2024, shall conform to the requirements of the Design Standards Illustrations 2023 (DSI). The DSI can be found Here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf Plan and profile are required for all mains 4-inches and larger and box notes are no longer permitted. You will not be required to provide profiles for water services, Fire Services, or Fire hydrant laterals. |