Plan Review Detail
Review Status: In Review
Review Details: TWPE 60% DESIGN REVIEW v.1
Plan Number - TW-PLAN-0526-0126
Review Name: TWPE 60% DESIGN REVIEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE System Planning | APPROVED | tees and valves not yet shown, will still need review at 90%. Sizing shown is approved. | |||
| TWPE Project Managers | IN REVIEW | ||||
| TWPE Pipeline Protection | PENDING ASSIGNMENT | ||||
| TWPE Senior Engineering Associates (SEA) | PENDING ASSIGNMENT | ||||
| TWPE Cathodic Protection | REVIEW COMPLETED | Agree with Cathodic Protection Notes. Cathodic Protection needs to be added to the drawing. | |||
| TWPE Survey | REVIEW COMPLETED |