TWPE System Planning APPROVED Approved. 12" along runway to be replaced with a 16" to maintain continuous 16" pipeline. Previous HA is still valid.
TWPE Civil Engineers (CE) PENDING ASSIGNMENT
TWPE Maintenance PENDING ASSIGNMENT
TWPE Cathodic Protection REVIEW COMPLETED No Cathodic Protection to review on this plan but it will be required
TWPE Engineering Chief - Authorization REVIEW COMPLETED TW-PLAN-0526-0126 CMAR 2 – 16” WATER LINE REPLACEMENT - 30% review
1) W1: Use updated title block which has signature lines for Chief Engineer and Deputy Director sign off.
2) W1: Add EPL Plan Number TW-PLAN-0526-0126
3) W6: Any and all easements needed for this project must be recorded prior to TW sign off on plans.
4) W5: Intermediate valve is not needed
5) W5 Replacement of northside 12" line is not needed hydraulically. further investigation is needed as to why it was determined to be replaced.
TWPE Engineering Manager Oversight REVIEW COMPLETED Review comments in BlueBeam Revu
TWPE Project Managers REVIEW COMPLETED Resigned to Jeff Hancock
TWPE Senior Engineering Associates (SEA) REVIEW COMPLETED VERIFY THAT ALL EXISTING UNDERGROUND WATER UTILITIES, HAVE BEEN ADEQUATELY IDENTIFIED. CONFIRM THAT UTILITY CROSSINGS AND POTENTIAL CONFLICTS HAVE BEEN EVALUATED AND THAT SUFFICIENT INFORMATION IS PROVIDED TO SUPPORT CONSTRUCTION. WHERE UTILITY LOCATIONS OR ELEVATIONS ARE UNCERTAIN, CONSIDER ADDITIONAL SUBSURFACE UTILITY ENGINEERING (SUE) INVESTIGATION OR POTHOLING, AS APPROPRIATE, TO VERIFY THE HORIZONTAL AND VERTICAL CLEARANCES.

VIEW THE PLAN FOR MORE COMMENTS.
TWPE Survey REVIEW COMPLETED Added comments to control sheet and plan view.BRS Completed 6/11/26
TWPE System Planning REVIEW COMPLETED No comments. A continuous 16" will remain, meeting hydraulic requirements.