Review Status: In Review

Review Details: TWPE 30% DESIGN REVIEW v.1

Plan Number - TW-PLAN-0526-0126
Review Name: TWPE 30% DESIGN REVIEW v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
TWPE System Planning IN REVIEW
TWPE Cathodic Protection PENDING ASSIGNMENT
TWPE Civil Engineers (CE) PENDING ASSIGNMENT
TWPE Engineering Manager Oversight PENDING ASSIGNMENT
TWPE Maintenance PENDING ASSIGNMENT
TWPE Survey PENDING ASSIGNMENT
TWPE Engineering Chief - Authorization REVIEW COMPLETED TW-PLAN-0526-0126 CMAR 2 – 16” WATER LINE REPLACEMENT - 30% review
1) W1: Use updated title block which has signature lines for Chief Engineer and Deputy Director sign off.
2) W1: Add EPL Plan Number TW-PLAN-0526-0126
3) W1: General alignment, why is the new pipeline so far to the southeast? A shorter route seems possible
4) W6: Any and all easements needed for this project must be recorded prior to TW sign off on plans.
TWPE Project Managers REVIEW COMPLETED Resigned to Jeff Hancock
TWPE System Planning REVIEW COMPLETED No comments. A continuous 16" will remain, meeting hydraulic requirements.