Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: PERMANENT SIGN REVIEW v.1
Permit Number - TS-PRM-1223-00631
Review Name: PERMANENT SIGN REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/22/2023 | Commercial Building | REQUIRES RESUBMIT | While this sign is in ROW, we're doing some of the permitting. I think they should utilize standard ASA engineering - and this is close to traffic, DTM will examine. | ||
12/19/2023 | Commercial Electrical | REQUIRES RESUBMIT | Neon sign in ROW island. PDSD doing the construction permitting piece. DTM doing ROW piece - yes, this is close to traffic. Going to consult DTM. Electrical Review comments- Please address the electric plan review comments and provide a written response. 1. Provide a complete electrical plan showing the branch circuit source of power location and compliance with NEC art 408.4 (Field Identification) and 600.5 (Dedicated branch circuit). If power to the sign is per a separate permit, please indicate this on the sign plan. Ref; 2018 IBC section 107.2.1, 2017 NEC. |
||
12/22/2023 | Signs | REQUIRES RESUBMIT | RE: neon "Miracle Mile" pole sign in median - reviewed for structure / lighting / location AT: approx 1000 N Stone Av Sign permit: TS-PRM-1223-00631 Date: 12/23/23 Reviewers: J. Eder / H. Thrall / D. Santa Cruz Codes: National Electrical Code (NEC) 600, Tucson - Pima County Outdoor Lighting Code (OLC) and International Building Code (IBC) 1. The location of this sign shall be reviewed and approved by Traffic Engineering at the Department of Transportation and Mobility. The sign is shown in the center of a street median. The concern is that the sign cabinet is aligned at the edges of the median curbs, which presents potential traffic issue. 2. Right of Way permit is required. Please ensure you have submitted for that on the TDC portal. 3. Per J. Eder, provide engineered marked plans indicating sufficient footer and mounting connections. Specify any welding and or high strength bolts. 4. Indicate that power is provided and how / where? Additional review will be provided once the safe sign location has been determined and engineering is provided. Email Heather.Thrall@tucsonaz.gov or Gloria.Salmeron@tucsonaz.gov with questions. |