Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.2
Permit Number - TR-UTL-0726-01127
Review Name: RIGHT-OF-WAY REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/04/2026 | Engineering Project Managers - Standard | REQUIRES RESUBMIT | See comments on pdfs submitted | ||
| 08/04/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Note call out Closure length (# Day or Weeks) of placement for each set up. 1) Review Redline Comments for Phase 1 - Brush Canyon & Gollob Rd packets. Review Tapers and Transitions for safety and Transitions at Side Street Egress. Tapers and Buffer placement and call out length. 2) Review Sign Spacing for Side Streets 2) Call out ALL TAPER Lengths on All plans 4) Review Packet Phase 3 Page #1 - Flagman Station comments. Will be required to be performed in sections not to exceed 500' Prior to Medians at Houghton. East most sections at Olive Wood Dr to be reviewed for NIGHT WORK with Law enforcement Intersection management, or Full Closure for WB travel with Detour Route, to provided lowest impact.. 5) Field Note for Bike Accommodation - Field Note: Bike should be Maintained behind TC for safety 6) Message Boards to be present on all project locations 7) Review Oak Park Closure Plan - Field Comment notes |
||
| 07/29/2026 | Transportation Application Review Express | REVIEW COMPLETED |