Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.2
Permit Number - TR-UTL-0326-00465
Review Name: RIGHT-OF-WAY REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/11/2026 | Archeological Sensitivity - Standard | PENDING ASSIGNMENT | |||
| 03/11/2026 | Transportation Application Review Express | PENDING ASSIGNMENT | |||
| 03/13/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | DTM Review comments - 1)Flagman station should have a min 100' setback for Arterial Right of Way or Provide a pull out lane to hold car outside the main travel lane. Prevent Vehicle stops on Arterial. 2) Please include both traffic control plans in same PDF file on next up load for approval |